An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tucson Electric Power Environmental Portfolio StandardProgram Summary

  2. TEP EPS Historic Performance:

  3. TEP EPS Historic Solar Production by Source Type: 2003 Annual Solar Energy Production: Type: Installed Capacity Annual Energy Energy % SunShare Systems 127 kWDCp 128 MWh 2.25% TEP Solar Partnering 43 kWDCp 70 MWh 1.23% TEP Customer Sited 34 kWDCp 57 MWh 1.00% TEP Utility Scale 4,102 kWDCp 5,440 MWh 95.52% Total Solar Generation 4,306 kWDCp 5,695 MWh 100.00%

  4. TEP EPS Financing Attributes: • Utility Scale PV Financial Opportunities • Up Front Financing matches schedule of incremental building blocks. • Minimum funding level of at least $5 M per year to achieve minimum cost scenarios. • No finance charges for high capital cost, rapidly declining cost electricity generation technology taking advantage of minimum module size available with PV. • Leverage of 10% of initial cost through Investment Tax Credits • Possible additional 18% leverage through Production Tax Credits • Double declining balance accelerated depreciation leverage • No loss of revenue from customer self generation; instead • Energy revenue from sale of solar energy is leveraged through investing in future PV at lower per unit cost as PV prices decline over time. • All energy consumers benefit in the long term.

  5. TEP EPS Historic Funding:

  6. TEP EPS Historic Expenses:

  7. TEP EPS Historic Surcharge Revenues:

  8. TEP EPS Surcharge Option:

  9. TEP EPS Surcharge Options Revenue Review:

  10. TEP EPS Surcharge Options Customer Impacts:

  11. EPS Future Directions: • 2005: • Customer Solar expands to 600 kWDC, SGSSS expands to 5.4 MWDC. • Continue wind survey data monitoring and analysis for all future years. • 2006: • Customer Solar expands to 800 kWDC, no expansion at SGSSS. • Expand landfill capacity to 15 MW. • 2007: • Customer Solar expands to 1,200 kWDC, SGSSS expands to 6,400 kWDC. • 2008: • Customer Solar expands to 1,600 kWDC, SGSSS expands to 7,500 kWDC. • 2009: • Customer Solar expands to 2,000 kWDC, SGSSS expands to 8,600 kWDC – final size. • 2010: • Customer Solar expands to 2,500 kWDC. • Initial 5 MW wind development startup • 2011: • Customer Solar expands to 3,600 kWDC. • Second phase 5 MW wind development startup • 2012: • Customer Solar expands to 5,000 kWDC. • Final phase 5 MW wind development startup

  12. Solar Future Improvements: • Reduce Module costs • Thin Film Technology Development and Reliability Improvements. • Better efficiencies of c-si cells through new treatment and coating processes. • Increased annual PV module production through investment in automation. • Development of low cost PV grade silicon stock. • Development of lower cost alternate packaging materials. • Experience. • Reduce Balance of System Costs • Continue inverter cost reductions to or below $0.20 per Watt AC. • Integrated module, support and electrical design. • Development of USSPV size PV modules (750 W DC) – can reduce BOS costs by 33%. • Reduce Transaction Costs • Larger PV system size. • Sited with other utility assets to share cost of common functions. • Coupled with optimally sized energy storage (SMES or CAES). • Reduced industry overhead as experience is gained with the technology. • Improve system performance, reliability and longevity. • Reductions in all three cost factors must be achieved in a sustainable manner through balanced market growth.

  13. TEP Solar Accomplishments: • Implementation of a Successful Customer Focused PV Support Program • Inverter Interaction with the Electric Grid as it Affects Reliability • IEEE-929 qualification conservative trip points • Grid event experience • RMR generation voltage support • NREL, Sandia and IEEE coordination • PV System Cost Reductions & Performance Improvements • Intermittent Renewable Resource Forecasting • Evaluation of Capacity Value of Intermittent Renewables • Developing a Library of Standardized PV System Data • Large Fixed Plane and with APS, Large Tracking Array PV Annual Energy Production Performance. • Evaluation of the annual energy production performance of a multitude of PV Module Technologies. • Evaluation of the performance of a wide Variety of Different Inverter Topologies and Manufacturers. • Initial and Operating Cost Data for a wide range of PV systems. • Identification and Resolution of Arizona Specific PV System Issues