1 / 21

Doing more with less

Doing more with less. Benefits of pipe relining. Roads & Works Conference 2012 Victor Harbor. Doing more with less. CIPP Relining – cured in place pipe Manhole to manhole Patch line 1 section Ability to go around bends Circular or oviform pipe shapes Diameter 100mm to 2000mm.

jadyn
Download Presentation

Doing more with less

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Doing more with less Benefits of pipe relining Roads & Works Conference 2012 Victor Harbor

  2. Doing more with less • CIPP Relining – cured in place pipe • Manhole to manhole • Patch line 1 section • Ability to go around bends • Circular or oviform pipe shapes • Diameter 100mm to 2000mm Roads & Works Conference 2012 Victor Harbor

  3. Doing more with less Manhole to manhole lining benefits • Seals full section which is essentially a new pipe within an old pipe • 3mm – 20mm structural liner • Prevents further issues in the future Roads & Works Conference 2012 Victor Harbor

  4. Doing more with less Roads & Works Conference 2012 Victor Harbor

  5. Doing more with less Roads & Works Conference 2012 Victor Harbor

  6. Doing more with less Roads & Works Conference 2012 Victor Harbor

  7. Doing more with less Roads & Works Conference 2012 Victor Harbor

  8. Doing more with less Roads & Works Conference 2012 Victor Harbor

  9. Doing more with less Roads & Works Conference 2012 Victor Harbor

  10. Doing more with less Roads & Works Conference 2012 Victor Harbor

  11. Doing more with less Roads & Works Conference 2012 Victor Harbor

  12. Doing more with less Roads & Works Conference 2012 Victor Harbor

  13. Doing more with less Roads & Works Conference 2012 Victor Harbor

  14. Doing more with less Roads & Works Conference 2012 Victor Harbor

  15. Doing more with less Roads & Works Conference 2012 Victor Harbor

  16. Doing more with less Roads & Works Conference 2012 Victor Harbor

  17. Doing more with less Roads & Works Conference 2012 Victor Harbor

  18. Doing more with less Patch Lining – Rehabilitation Benefits • Seals only one section of pipe • Ground water leaking in • One section of pipe damaged by tree roots • 1.5m up to 18m • 3mm – 20mm structural liner Roads & Works Conference 2012 Victor Harbor

  19. Doing more with less Roads & Works Conference 2012 Victor Harbor

  20. Doing more with less Roads & Works Conference 2012 Victor Harbor

  21. Doing more with less Roads & Works Conference 2012 Victor Harbor

More Related