LINK 2000+ update Datalink Implementation EC Regulation 29/2009

LINK 2000+ update Datalink Implementation EC Regulation 29/2009. ICAO WGM#20 Montreal, 23-25 January 2013. Liviu Popescu on behalf of Søren Dissing Link Central Reporting Office. 29/2009 Key Dates. Aircraft Forward Fit. ANSPs LINK/Core Region. Aircraft Retrofit Fit. ANSPs All of EU.

jafari
Download Presentation

LINK 2000+ update Datalink Implementation EC Regulation 29/2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LINK 2000+ updateDatalink ImplementationEC Regulation 29/2009 ICAO WGM#20 Montreal, 23-25 January 2013 Liviu Popescu on behalf of Søren Dissing Link Central Reporting Office

  2. 29/2009 Key Dates Aircraft Forward Fit ANSPs LINK/Core Region Aircraft Retrofit Fit ANSPs All of EU 7th Feb 2013 1st Jan 2011 5th Feb 2015 2009 2010 2011 2012 2013 2014 2015 2016

  3. Incentives Status • Funded by TENT-EA • Circa 500 aircraft to be equipped • Scheme now closed Some delays in Equipage, Cert (Re-Cert) Issues

  4. DLS-IR Exemptions - Status 1st Report to European Commission Nov 2010 >> SSC Decision May 2011 No Temporary Exemptions beyond Dec 2012 Max. 940 aircraft permanently exempted 2nd Report Sep 2011 >> SSC Decision Dec 2011 Max. 2820 aircraft permanently exempted Total impact – 4.6 % of flights exempted Does not impact DLS-IR target 75% of flights Final applicant submission End 2012 >> 3rd Report & Final Decision No impact on Dates for Ground Implementation i.e. 2013 “core” Europe and 2015 rest of Europe

  5. Ground Implementation Status...2013 States Today: MUAC and DFS are operational

  6. Ground Implementation Status...2013 States Feb 2013: Skyguide and NAV Portugal

  7. Ground Implementation Status...2013 States Q2/2013: NATS

  8. Ground Implementation Status...2013 States Q4/2013: ENAV

  9. Ground Implementation Status...2013 States Q1/2014: IAA

  10. Ground Implementation Status...2013 States Q4/2014: Austrocontrol

  11. Ground Implementation Status...2013 States Q4/2015: AENA

  12. Ground Implementation Status...2013 States 2016…2019: DSNA

  13. Knowledge Management Wiki Website • For the Programme • Maintained by EUROCONTROL • Official source for Programme documents • FAQs for official answers • For the CRO • Maintained by all CRO members • Less formal, less control • Forum for asking questions www.eurocontrol.int/link2000 www.eurocontrol.int/link2000/wiki

  14. LINK 2000 Website Library Official information • Regulation • Community Specifications • Eurocontrol Documents • Eurocontrol Specification • OPS guidance • TECH guidance

  15. LINK 2000 Wiki For the CRO community • Deployment Status • Current Issues • Problem Reporting • CRO library • Forum

  16. Questions?