Bharat Sanchar Nigam Limited Rajasthan Circle. Management Meeting 18 th July 2012. NWO-CFA Unit. 1. AGENDA / ISSUES. CFA Target & Achievement Network Operation related issues Switch/AMC related issues USO Subsidy (VPT & BB) issues Status of disposal of PG cases

jagger
Download Presentation

Management Meeting 18 th July 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bharat Sanchar Nigam Limited Rajasthan Circle Management Meeting 18th July 2012 NWO-CFA Unit 1

  2. AGENDA / ISSUES CFA Target & Achievement Network Operation related issues Switch/AMC related issues USO Subsidy (VPT & BB) issues Status of disposal of PG cases Regulatory issues related to IOBAS & POIs issues 2

  3. CFA Target & Achievement 3

  4. AGENDA/ISSUES Network Operation related issues Disconnection of Landlines QoS Parameters and Achievements TAX NMS report / CCR Corrective action for mtce. of unmanned exchanges Closure of exchanges having less than TEN DELs Exchange failure during the month of June ‘12 4

  5. Disconnection of Landlines 2011-12 (up to June 12) 5

  6. QoS Parameters – TRAI & MOU Target (12-13) 6

  7. QoS Achievements – Fault Clearance for June 2012 7

  8. QoS Achievements – CCR for June 2012 8

  9. TAX NMS & CCR • The critical performance Parameters like CCR , outage & congestion in TAX routes are monitored by Corporate office through reports generated by NMS server. • TAX CCR Target set by the Corporate office is 56% for 2012-13 • SSA Heads may monitor the reports generated from TAX NMS on daily basis and initiate suitable actions thro’ TAX in-charges to improve the CCR. • NMS circle-wise CCR report for Northern Zone from 01st Jul. to 10th Jul. ‘12. 9

  10. TAX NMS Report of Critical Performance Parameters July 2012 (from 01.07.12 to 15.07.12) 10

  11. Details of Unmanned Exchanges, Exchanges without E/A and poor earth (As on 01.04.12) 11

  12. SSA-wise status of Unmanned Exchs., Exchanges without E/A and poor earth (As on 01.04.12) 12

  13. Status of Exchanges with < 10 DELs as on 31.03.12 Note : As per BSNL Corporate office guidelines, exchanges having less than 10 DELs can be closed down, if there is no GSM / CDMA BTS available in the same premises by diverting the DELs to WLL CDMA or to Nearby Exchange 13

  14. List of Exchanges with < 10 DELs as on 31.03.12 14

  15. Exchange failures during June 2012 15

  16. AGENDA/ISSUES Switch/AMC related issues Verification and certification of CLI based bills raised by M/s Elitcore for NET-ONE service (since June ’09) Online monitoring of Exchange Alarms-Installation of RAISE system in all local switches Closure of E-10B exchanges in Ajmer & Alwar SSA Renewal of AMC for NT switches viz. EWSD/ OCB/ AXE-10 Pending QTPCs for settlement of AMC bills Duplex working of IOPs of C-DOT MBM switches Conversion of C-DOT MBMs into RSUs 16

  17. AMC Related Issues Current status of verification and certification of billing data of NET-ONE services provided by M/s Elitcore 17

  18. Switch Related Issues Implementation and connectivity of exchanges through RAISE system 18

  19. Closure of E-10 B exchanges in Rajasthan 19

  20. AMC Related Issues Status of renewal of AMC of NT Exchanges for the current year of AMC operation NOTE -1: AMC of OCB-ITI, OCB-ALCATEL Exchanges has expired on 31-03-2012. Renewal of AMC 2012-13 is under process. 20

  21. AMC Related Issues QTPC not yet received, as on 16.07.2012 21

  22. Duplex working of CDOT IOPs • IOPs must be in duplex mode for uninterrupted CDR collection • Missing CDR files in CDOT exchanges are neither available in CES nor in IOPs in case both IOPs are down • IOP functioning status can be obtained from CDR Mediation http://10.202.215.24:8081/nmediation/) by SSA CDR Co-ordinator. SSA Heads may monitor this on daily basis. • Spare IOPs must be kept available for immediate replacement. • Spare IOPs available in SSAs due to SBM to RSU conversion. 22

  23. Duplex working of CDOT IOPs • Status of IOPs in Simplex Mode as on 16.07.12 23

  24. Switch Related Issues Action plan for conversion of C-DOT MBM into RSUs 24

  25. AGENDA / ISSUES USO Subsidy (VPT & BB) issues: SPV Commissioning Status Zero MCU VPTs Potential Loss of Subsidy DSPT Fault Status BB Kiosk status DSLAMs loading status 25

  26. Installation of SPVs allotted for VPT agreement as per census 2001 26

  27. ZERO MCU VPTs • Status of ‘0’ MCU VPTs is monitored by CMD/ Dir (CFA) • ZERO MCU VPT is one of the parameter for Circle GPMS evaluation with target <10%. • VPT meter reading needs to be analyzed and Zero MCU VPTs are to be got attended on priority. • Relocation and Conversion of faulty/ DNP/Closed VPT to Prepaid CDMA VPT. 27

  28. ZERO MCU VPTs 28

  29. Potential Subsidy loss (Q1 FY 12-13) 29

  30. DSPT fault status as on 13.07.12 30

  31. Provision of Display Boards (as on 13.07.12) 31

  32. Provision of Charge Indicators (as on 13.07.12) 32

  33. Provisioning of Kiosks (as on 31.03.12) 33

  34. USO DSLAMs LOADING STATUS – Rural Broad Band cnxns. as on 31.03.2012 34

  35. Rural BB connections as on 31.03.12 37

  36. AGENDA / ISSUES Disposal of PG cases Summary of pending PG cases Long pending cases on CPGRAMS Long Pending cases on PGRMS Landline Fault Status (CDR System) Pending dockets booked on 1500 38

  37. Summary of all pending PG cases (as on 13.07.12) 39

  38. Cases Pending on PGRMS PGRMS Circle • CMD Cases- Category ‘B’ • CGM Cases- ‘C’, ‘I’ & ‘TC’ BSNL HQ: VIP Cases 1. MOC Cases- Category ‘M’ & ‘SU’ 2. TRAI Cases- Category ‘TM’, ‘TC’ & ‘TB’

  39. Long pending PGRMS cases (as on 13.07.12) 41

  40. Cases Pending On CPGRAMS • DARPG • DPG • DOT • DOPPW • MOCPG • Ministry of C&IT

  41. Long pending CPGRAMS cases (as on 13.07.12) 43

  42. Long pending MOC/MOSC cases (as on 13.07.12) 44

  43. Landline faults through CDR system (as on 13.07.12) Landline faults through CDR system (as on 09.07.12)

  44. Pending dockets on Call Centre (as on 13.07.12)

  45. Regulatory Issues related to IOBAS & POIs Details of TGPs created in the exchange should be entered in the IOBAS portal on the same day of creation. It should be taken care of specially at the time of conversion of main exchanges into RSUs CDRAS call duration/ MCUs should be entered in IOBAS portal by POI in-charges by 2nd of every month. Reqd. for auditing IUC billing done by DC Chandigarh Removal of CDR errors by POI in-charges 47

  46. The End