Update on FCPS Construction/Renovation Projects

Update on FCPS Construction/Renovation Projects. June 2009. Cassidy Elementary – Renovation. Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date: August, 2010 Contract Sum: $9,061,000 Change Orders to Date: $0

Download Presentation

Update on FCPS Construction/Renovation Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on FCPS Construction/Renovation Projects June 2009

  2. Cassidy Elementary – Renovation • Architect: Tate.Hill.Jacobs: Architects • General Contractor: D.W. Wilburn, Inc. • Substantial Completion Date: August, 2010 • Contract Sum: $9,061,000 • Change Orders to Date: $0 • Current Phase: 1 (On Schedule) • Estimated Completion: 14%

  3. Cassidy Elementary – Renovation Rendering of Final Façade

  4. Cassidy Elementary – Renovation • Work Completed in Last 30 Days: • Primary electric conduit at new Cassidy parking lot. • Foundations for 2-Story Admin/Classroom and Music Rm./Mech. Rm. Additions. • Masonry mockup complete and block work begun on additions. • Under slab plumbing and electrical rough-ins installed and inspected in 2-Story Admin/Classroom Addition. • Under slab plumbing and electrical rough-ins begun in Music Rm./Mech. Rm. Addition. • Current Work Effort (June): • Primary electric conduits to new transformer pad location. • Site storm and sanitary sewer work will begin at front of building. • Gas, water and fire protection utilities will begin into building. • All Phase 1 foundation and ground floor slab concrete will be complete. • Block masonry bearing wall installation to continue.

  5. Cassidy Elementary – Renovation • Current Work Effort (June - continued): • Steel columns and beams in front 2-Story Addition to be complete. • Underground primary plumbing rough-ins complete. Secondary rough-ins to continue. • Underground electrical work to be complete. Secondary rough-ins to continue.

  6. Cassidy Elementary – Renovation New 2-Story Admin Addition Masonry Mockup Interior Corridor Barrier Music Room Addition

  7. Russell Cave Elementary – Renovation • Architect: Pearson & Peters Architects • General Contractor: Congleton-Hacker Construction • Substantial Completion Date: August, 2010 • Contract Sum: $5,001,150 • Change Orders to Date: $0 • Current Phase: 1 (On Schedule) • Estimated Completion: 6%

  8. Russell Cave Elementary – Renovation Rendering of Final Façade

  9. Russell Cave Elementary – Renovation • Work Completed in Last 30 Days: • Footing and foundation walls continue: 40 feet of footings poured and 38 feet of foundation wall have been poured • Interior wall footings: 200 feet have been poured. • Footings at new mechanical enclosures have been poured. Pads for mech units at kitchen and new transformer and generator have been poured. • Current Work Effort (June): • Additional work on footings and foundation at the new addition will continue. New floor slab will be poured in two weeks, weather permitting. • Installation of the new leach fields for the septic system will begin installation in the front lawn of the building. • Kitchen/Cafeteria demolition and renovation will begin. • Renovation of (4) classrooms on the south side will begin. • Masonry restoration on the existing building will begin the week of June 8th.

  10. Russell Cave Elementary – Renovation Foundation Work 6.2.09 Foundation Work 6.2.09 Foundation Work 6.2.09 Foundation Work 6.2.09

  11. Arlington Elementary – Renovation • Architect: RossTarrant Architects • General Contractor: W/S Construction • Substantial Completion Date: August, 2010 • Contract Sum: $9,920,194 • Change Orders: $36,900 (#1--Demo) • Current Phase: 1 (On Schedule) • Estimated Completion: Demo – 100%

  12. Arlington Elementary – Renovation Rendering of Final Façade

  13. Arlington Elementary – Renovation • Work Completed in Last 30 Days: • WS-Construction has mobilized. • Site preparation has begun, including erosion control adding engineered fill, and preliminary grading . • Structural shoring of existing walls has also begun. • Current Work Effort (June): • Selective demolition, additional site work and the laying out of the new building footprint.

  14. Arlington Elementary – Renovation WS Construction Trailer Site Prep / Erosion Control Preliminary Grading

  15. Bryan Station Middle – Renovation • Architect: Clotfelter-Samokar Architects • General Contractor: Preston Construction Group • Substantial Completion Date: August, 2010 • Contract Sum: $10,769,400 • Change Orders to Date: $0 • Current Phase: 1A (On Schedule) • Estimated Completion: 7%

  16. Bryan Station Middle – Renovation Rendering of Final Façade

  17. Bryan Station Middle – Renovation • Work Completed in Last 30 Days: • General Contractor and sub-contractors are on site beginning demolition and preparing areas for new work. Phase 1A has begun. • Barricade fencing, storage facilities and stored materials now on site. • Owner-provided staff is on-site moving large amounts of furniture and equipment out of areas to be renovated. • Owner-installed portable classroom units appear to be nearly complete. Electrical connections underway. • Owner-provided asbestos abatement being performed in cafeteria. Nearly complete. • Current Work Effort (June): • Sanitary sewer extensions also underway. • Roof being demolished and new roofing installed throughout the month of June. • Floor demolition complete in kitchen and cafeteria and under-slab plumbing installation has begun. • Earthwork and site demolition of paving and concrete has begun. • Duct work and electrical work has begun.

  18. Bryan Station Middle – Renovation Kitchen Demolition Cafeteria Asbestos Abatement Rear Entry Wall Demo Portable Classrooms

  19. Leestown Middle – Renovation • Architect: Lucas/Schwering Architects • General Contractor: D.W. Wilburn, Inc. • Substantial Completion Date: August, 2010 • Contract Sum: $11,182,000 • Change Orders to Date: $0 • Current Phase: 1, 1a, 1b (On Schedule)

  20. Leestown Middle – Renovation Rendering of Final Façade

  21. Leestown Middle – Renovation • Work Completed in Last 30 Days: • D.W. Wilburn mobilized on-site. • Phase 1demolition efforts commenced. • Asbestos abatement started. • Current Work Effort (June): • Interior and exterior demolition in Phases 1, 1a & 1b will continue. • Structural shoring to be erected. • Foundations for the new Kitchen will be poured. • Electrical and Plumbing rough-ins to begin. • Interior and load bearing masonry to start.

  22. Lafayette High Stadium – Replacement • Architect: Strand & Associates • General Contractor: Set to bid July 6 • Substantial Completion Date: July, 2010 • Contract Sum: TBD • Change Orders to Date: $0 • Current Phase: Construction Documents

  23. Lafayette High Stadium – Replacement Existing Campus

  24. Lafayette High Stadium – Replacement Existing Football Stadium

  25. Lafayette High Stadium – Replacement New Football Stadium

  26. Central Bus Garage – Adaptive Reuse • Architect: Lucas/Schwering Architects • General Contractor: James R. Leake & Sons, Inc. • Substantial Completion Date: August, 2009 • Contract Sum: $2,782,000 • Change Orders to Date: $0 • Current Phase: Construction

  27. Central Bus Garage – Adaptive Reuse Façade

  28. Central Bus Garage – Adaptive Reuse Proposed Floor Plan

  29. Central Bus Garage – Adaptive Reuse • Work Completed in Last 30 Days: • All concrete has been sawn and approximately 85% has been removed. • All out buildings scheduled to be removed have been removed. • Interior doors/windows have been removed. • Electric demo 70% complete. • HVAC demo complete. • Specialty equipment overhead work complete. • Mason has completed wall construction. • 90% of overhead electric complete. • 70% of exterior underground piping complete. • 100% of primary is complete. • Grading is proceeding on new parking lot.

  30. Central Bus Garage – Adaptive Reuse • Current Work Effort (June): • Interior concrete to be demolished. • Equipment pits to be dug. • Footing for addition to be completed. • Parking lot pole bases/bollards to be installed. • Concrete patching to be completed. • Storm lines to be installed.

  31. Central Bus Garage – Adaptive Reuse Interior Pit at Paint Booth Exterior Excavation – Sanitary Line Exterior Slab Replacement – Parking Area