Wave 3 Scope and High Level Timeline Plan Version 1_JH 22 nd June 2012

Lean Service. Wave 3 Scope and High Level Timeline Plan Version 1_JH 22 nd June 2012. Wave 3 Scope: Issue 10.2 Approved by Steering Committee 19/6/12. Issue 10.2. Previously. Steering Committee Approved Plan. 10th sub wave not used.

Download Presentation

Wave 3 Scope and High Level Timeline Plan Version 1_JH 22 nd June 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lean Service Wave 3 Scope and High Level Timeline PlanVersion 1_JH22nd June 2012

  2. Wave 3 Scope: Issue 10.2 Approved by Steering Committee 19/6/12 Issue 10.2 Previously Steering Committee Approved Plan 10th sub wave not used • 9 Sub waves in wave 3 but more FTE than business plan forecast 11

  3. Lean Service Wave 3 Timeline Pan Proposal Sponsor On-Boarding Workshops • Points to Note: • the plan can be managed avoiding key Olympics/Paralympics dates • Wave 2 completes 21st September giving resources moving from W2 to W3 a 2 week break before W3 mobilisation commences • Mobilisation phase completed as early as possible making UK October school half term a non-critical week • Christmas week (two bank holidays) has been discounted from the plan; wave execution completes one week later than original SC dates but with no impact to the benefits realisation completion date. • The ‘mobilisation phase for non UK teams may be different if key events are required outside of the UK – planning work is underway to understand the international requirements. Issue 1 Sponsor On-Boarding 1-day Workshops (1 per sub-wave) Mobilisation Planning Pre-Wave Data Collection Plan (Workshop 1) Additional Data Collection (Workshop 2) Facilities management Method review / learning, up-dating method material, new training requirements defined