An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wednesday June 22nd • 08:30 Machines in stand-by • 12:30 Access in LHC for QPS and PC: • QPS quench heater power supply RB.A12 • EPC for RSF2.A67B2 and RQ9.R8B1. • RCBH27.L1B2 was taken out of s81 SOC and put in not_used, will be repaired from EPC at the next occasion: today… • Alarm added to “big sister” for OFSU crashes • 16:24 Power cut • Lightning striking us… • Several EL breakers as various levels tripped LHC morning report

  2. Thursday June 23rd • Status morning: Everything recovered except… • Cryo problems in point 4 & 8: water was stopped. To be recovered. Estimate: this afternoon. • Cryo problem in point 3: EL issue, damaged equipment. To be fixed. • Compensators to be reconnected. • RCBCH10.L3B1, no communication  to be checked this morning. • All PC for instrumentation to be switched on. • QPS communication problem with controller of RQD/F in 67, needs a reset in the tunnel. • Remote control with some valves to be checked. • Status experiments: ATLAS needs access, CMS OK, LHCb OK, ALICE OK. To be switched on later… LHC morning report

  3. Thursday June 23rd • In the shadow of recovery: • Repair RCBH27.L1B2. • Access P6 for pulsing kickers in local. • Install additional diagnostics for OP and upcoming MD. • Firmware upgrade for ADT beam position modules (observation only affected) • TI2 AUG (red button) repair • … • Let us know any needs for access, we must organize… LHC morning report

  4. Ahead • Check injection kicker pulse. • Collimation loss maps (450 GeV, 3.5 TeV): ran out of 4 week qualification interval. • Next intensity step: 1092b  1236b LHC morning report