1 / 5

Status of ACE availabilities

Status of ACE availabilities. Wojciech Lapka GDB, 6 th April 2011. March reports. Using GridView (official report) : http://gvdev.cern.ch/GRIDVIEW/downloads/Reports/201103/wlcg/ Using ACE (Availability Computation Engine): Standard: ( http:// tinyurl.com/201103-ace-standard-alg )

james-rush
Download Presentation

Status of ACE availabilities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of ACE availabilities Wojciech Lapka GDB, 6th April 2011

  2. March reports • Using GridView (official report): • http://gvdev.cern.ch/GRIDVIEW/downloads/Reports/201103/wlcg/ • Using ACE (Availability Computation Engine): • Standard: (http://tinyurl.com/201103-ace-standard-alg) • AND of (sBDII, SRM, LCG-CE, ARC-CE, OSG-CE) • No LCG-CEs: (http://tinyurl.com/201103-ace-no-lcgce-alg) • AND of (sBDII, SRM, CREAM-CE, ARC-CE, OSG-CE) • OR of CEs: (http://tinyurl.com/201103-or-of-CEs-alg) • AND of (sBDII, SRM, OR of any CE flavour) 2

  3. ACE & GridView comparison (OPS) For the standard and official algorithm: • Differences for daily availabilities for ~15 sites • Some bugs were detected • 11 tickets already fixed • 6 remaining tickets to be fixed by mid April • Also, topology info was missing/wrong in GOCDB • 4 GGUS tickets opened to sites • Please ensure that services are declared in GOCDB • Arc-CE tests are different in Nagios and SAM • In contact with the responsibles for ARC submissions 3

  4. ACE Plan • By mid April • Issues identified should have been solved • Beginning of May • Generate the reports considering the last 2 weeks of April • Present comparison of reports: • GridView vs ACE standard algorithm • Standard vs the two ACE algorithms including CREAM 4

  5. Questions? 5