1 / 13

系統七部 Q1/2007 工作報告

系統七部 Q1/2007 工作報告. Prepared by SimonBW / CH Date : 03/26/2007. CNC/ KSP QAD system Maintenance. OBJECTIVE :. 一 .CNC QAD program 須求 1. 大工單 - 小工單 須求 : 用 KSP 已開發程式 ,3/26 已放在 UAT , 通知 User 測試 2. PO 須 Super user 功能 : 3/26 已完成 , 4/4 上 prod

janae
Download Presentation

系統七部 Q1/2007 工作報告

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 系統七部 Q1/2007 工作報告 Prepared by SimonBW / CH Date : 03/26/2007

  2. CNC/ KSP QAD system Maintenance • OBJECTIVE : 一 .CNC QAD program 須求 1.大工單-小工單 須求 : 用 KSP 已開發程式 ,3/26 已放在 UAT ,通知User 測試 2. PO 須 Super user 功能 : 3/26 已完成 , 4/4 上 prod 3. PO overdue 的日期須改設定為 run autopo 的隔天 . 4. CPO 周翔於 4/9 調到CNC 5. 其它報表 /維護程式修改 二. KSP QAD program 須求 1. 王雪芳 / 張利民 需再訓練其它模組 2. 4/25 已面試並確認新人於 5/1國假後報到. 3. ABO EDI 及各模塊SOP 的建立 4. 其它報表 /維護程式修改

  3. KSP/CNC QAD system Training • KSP 王雪芳 ---年資一年多 , 熟進出口 / 採購系統 • KSP 張利民 ---約 1年 , 須再訓練 • CNC 李星 ---熟採購系統 , 轉由周翔做訓練 • CNC 丁曉峰 ---3/5 轉正 , 將轉由周翔做訓練工作

  4. eService System (1) • my job is to build the eService System • OBJECTIVE : • Import SAP data and ISPD R1R3 data • Query replaced BOM platform

  5. BI for CCD Report Project (2) • OBJECTIVE : • Help user to generate the report by BI • Help user to build the FRU data and group mapping rule • Build a web site for user maintain data

  6. FIWH Project (3) • OBJECTIVE : • Receive SAP and ATS Inventory daily • Generate BI reports automatically • Send ATS AIR doc to ATS • Build maintain KPI WEB platform • Total : 12 Reports

  7. SQE Project (4) • OBJECTIVE : • Transfer SAP platform to WEB platform • Get data from SAP daily • Get SAP data in real time and display on WEB • After user confirm data , Response data to SAP in real time • Waiting BI Server PR approval .

  8. RMA (5) • OBJECTIVE : 1.Download T&C table 2.Upload T&C Table 3.在Web 維護 T&C Table 4.RMA simulation 5.Generate RMA Number . 6.Create Customer Request Form head

  9. Authorization Control SOP (6) • OBJECTIVE : • 建立管控User登入系統機制(Web 部分)

  10. Data Center SOP (7) • OBJECTIVE : • 統計User使用系統狀況(包含Web,及 Analyzer) • 統計資料庫資料量的變化(SQL Server) • 統計報表流覽使用狀況(Analyzer) • BI/eService 帳號申請表

  11. RMS Project (8) • OBJECTIVE : • 13 Reports • 準時開線率 • 外部轉嫁/部門轉嫁 • 良率 by Project • 生產排程達成率 • …….

  12. PCBA Project (9) • OBJECTIVE : 1) Showing slow moving PCBA by model/SKU/P/N weekly. --- PCBA staid in SMT over 7manufacturing/working days. 2) Each slow moving PCBA’ s QTY trend chart. --- With past 10 weekly data’s trend chart, with upper control limit line 3) Tracking system to monitor each factory assigned SMT manager’s report. --- Escalation function when report delayed over 2 days --- Improvement or corrective action should be ready on the report. --- System automatically forward to relative operation director by weekly. --- GM office’s VP level managers receive the report once a month.

  13. FIWH Project V1.5 (10) • OBJECTIVE : • Show raw data from BI • Change ATS AIR file format • Get New message from ATS • Generate 1 new report