1 / 3

RTCA SC-217/EUROCAE WG-44 Connectivity subgroup status

RTCA SC-217/EUROCAE WG-44 Connectivity subgroup status. Goals of AMDB taxi network: Fully connected network throughout taxiway and runway areas made up of node and edge features Extendable to stand/apron areas High enough fidelity to support situational awareness intended functions

jane
Download Presentation

RTCA SC-217/EUROCAE WG-44 Connectivity subgroup status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RTCA SC-217/EUROCAE WG-44Connectivity subgroup status • Goals of AMDB taxi network: • Fully connected network throughout taxiway and runway areas made up of node and edge features • Extendable to stand/apron areas • High enough fidelity to support situational awareness intended functions • Support “smooth curve” depiction of taxi route • Incorporate guidance line data when possible • Derive network automatically for large majority of situations (minimize need for manual intervention/steps) • Support creation of a graphical taxi path, including turn/hold/etc. instructions and geographical positions • Appropriate for use in ground-based and/or on-board applications • D-TAXI like applications with datalinked taxi route as well as aircraft-based apps • Generic enough solution so that ground and aircraft don’t need to have a common database • Support applications like surface traffic (trajectory intent) in addition to taxi routing • Provide high-level requirements and guidance/examples in AMDB standards, but not specific algorithms

  2. RTCA SC-217/EUROCAE WG-44Connectivity subgroup status • Major decisions/progress made thus far: • Use polygon geometries to achieve connectivity/compute the node positions • Removes need to overcome issues with gaps/virtual lines to achieve connectivity • Place nodes on shared sides of polygons (higher level of fidelity than using centroids of polygons) • Treat holding positions like shared sides • Use TaxiwayGuidanceLine, runway PaintedCenterline, and RunwayExitLine features when available • Initial AMDB feature definitions and capture rules defined • Initial prototyping of node and edge computation

  3. RTCA SC-217/EUROCAE WG-44Connectivity subgroup status • Next Steps: • Continue development of proof-of-concept prototypes to show that deriving taxi network from existing data with a minimum of manual intervention is feasible • Node and edge computation currently in work • Will start working on routing algorithm soon • Proof-of-concept prototypes will help validate requirements and identify special cases that need further attention • Work with SC-214/WG-78 on aligning vision of graphical route requirements and datalink message content • Formation of “Tiger Team” • Questions?

More Related