1 / 2

Transverse emittances during Abort Gap cleaning tests 30-Sep-2010 (plots on next page)

Transverse emittances during Abort Gap cleaning tests 30-Sep-2010 (plots on next page). Bunch 1 and 1201at 450 GeV (separated by dt=abort gap) Emittance measured by: WS with acquisition gate (~10us) centered on Bunch 1 , not blind to Bunch 1201

Download Presentation

Transverse emittances during Abort Gap cleaning tests 30-Sep-2010 (plots on next page)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transverse emittances during Abort Gap cleaning tests 30-Sep-2010 (plots on next page) • Bunch 1 and 1201at 450 GeV (separated by dt=abort gap) • Emittance measured by: • WS with acquisition gate (~10us) centered on Bunch 1, not blind to Bunch 1201 • BSRT with acquisition gate 25 ns changing from bunch 1 to bunch 1201 every ~10 sec • Two fills: • 1-cleaning system setup • emittance increase of both bunches while changing settings before 14:00 • strong emittance increase of bunch 1 (H and V) and bunch 1201 (V) at ~ 14:05 • 2-cleaning test with optimized settings • cleaning switched on and off at least two times (tbc by Wolfang) and no evidence of variation of the initial emittance increase rate (~linear and similar to what normally seen by nominal bunches sitting at injection)

  2. FILL 2: AGAP cleaning FILL 1: Setup

More Related