QC Throughput Rate Improvement

QC Throughput Rate Improvement. TECH 50800 Project Measure Phase. Project Review. Productivity is the KPI at our facility. So if productivity is increased the cost decreases.

jasia
Download Presentation

QC Throughput Rate Improvement

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. QC Throughput Rate Improvement TECH 50800 Project Measure Phase

  2. Project Review • Productivity is the KPI at our facility. So if productivity is increased the cost decreases. • No project has been done for the AWCC Quality productivity (KPI). Since the repair department is being transferred to another facility, need is to understand the productivity expectations.

  3. SIPOC

  4. CTQ Tree Customers CTQ KPOV KPIVs Manpower Labelers Overall repaired phone Functional test QC’d Phone Kitters Components Final QC check Associates ICE

  5. ProcessMap

  6. Process observation worksheet • Check sheets • Spaghetti diagram

  7. Data Collection Plan • Historical data • Process owner • Excel file attached with the presentation

  8. Graphical Representation

  9. Graphical Representation(haroldo)

  10. Graphical Representation(gloria)

  11. Mean, Median, Mode, Standard deviation, Range

  12. Mean, Median, Mode, Standard deviation, Range

  13. Mean, Median, Mode, Standard deviation, Range

  14. SWOT

  15. Tollgate Review • I Concur that the Measure phase was successfully completed on 10/22/2013 • I concur the project is ready to proceed to next phase: Analyze Greg Malone Process Owner Anil Nair Champion/MBB

  16. Thank You