An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report to assess quality and efficiency of allocation methods in the region CEE Implementation Group 30th April 2009

  2. Scope of the report • To provide a report about the usage of interconnection from technical and economical point of view • To collect different kind of useful information for market monitoring in a single report • To help national Regulators to achieve a common view on how to improve the congestion management within the region • ‚Light version‘ of the report is planned in a first step (as detailed data is not available in all countries)

  3. Structure of the report • Cross border flows in the CEE region and between the region and other countries (data from TSOs) • Congestion Management Methods within the region (NRAs) • Economic efficiency of these CM Methods • Capacity calculation and management

  4. Economic Efficiency Global figures and auction data • Comparison between actual and ex post assessment of congestion rent • Auction results for yearly, monthly and daily auctions • Secondary market • Efficient usage

  5. Capacity Calculation • Capacity procedure and TRM • Evolution of transfer capacity throughout 2008 • Costs to granting grid security • Curtailments occurred in 2008

  6. Next Steps • Feedback of TSOs • Data availability? • Timetable with exact milestones

More Related