Ch. 2 Strategic Managementand Project Selection • Maturity of Project Management • Criteria for PS Models • Nature of PS Models • Types of PS Models • Uncertainty Analysis and Risk Management • Information Base for PS Models • Project Portfolio Process (PPP) • Project Proposal
Ch. 2.0: Overview of PS Process • Project Management Office (PMO): Aligning corporate needs and project goals • Project Selection: Chose candidate project using Evaluation Criteria • Dealing with Uncertainty: Risk Analysis • Strategically selecting best Projects: Project Portfolio Process (PPP) • Locking up the deal: Writing a Project Proposal
Ch. 2.1: Project Management Maturity Levels • Ad-hoc (essentially disorganized) • Abbreviated (some processes exist) • Organized (standardized processes) • Managed (measured processes) • Adaptive (continuous improvement)
Ch 2.2: PS Models • Idealized view of reality • Representing the STRUCTURE of the problem, not the detail • Deterministic or stochastic
Ch. 2.2: Criteria for Project Selection models • Realism (technical-, resource-, market-risk) • Capability (adequately sophisticated) • Flexibility (valid results over large domain) • Ease of Use (no expert needed to run model) • Cost (much less than project benefit) • Easy Computerization (use standard software)
Ch. 2.3: Nature of PS models:Caveats • Project decisions are made by PM --- NOT by PS model! • A PS model APPROXIMATES, but does NOT DUPLICATE reality!
Ch. 2.3: Nature of PS Models:Methodology • Start with detailed list of firm’s goals • Create list of project evaluation factors (PEF’s) • Weigh every element in PEF list • Compute an overall score for project based on weighted PEF’s • Select project that has the closest alignment with firm’s goals
Ch 2.3: Project Evaluation Factors (PEFs) • Production Factors • Marketing Factors • Financial Factors • Personnel Factors • Administrative and Misc. Factors
Ch 2.4: Types of PS Models:Nonnumeric • Sacred Cow • Operating Necessity • Competitive Necessity • Product Line Extension • Comparative Benefit Model
Ch 2.4: Numeric PS Models:Profit / Profitability • Payback Period (PB) • Average Rate of Return • Discounted Cash Flow (NPV) • Internal Rate of Return • Profitability Index • Other Profitability Models
Unweighted 0-1 Factor Model Unweighted Factor Scoring Model Weighted Factor Scoring Model Constrained Weighted Factor Scoring Model S = ∑(x) S = ∑(s) S = ∑(s·w) S = ∑(s·w) ∏(c) Ch 2.4: Numeric PS Models:Scoring
Ch 2.4: Choosing the PS Model • Dependent on wishes and philosophy of management • 80% of Fortune 500 firms choose “nonnumeric” PS models • Firms with outside funding often chose scoring PS models • Firms without outside funding often chose profit / profitability PS models
Ch 2.5: Management of Risk:Terminology • Risk: Decision based on complete information about the probability of each possible outcome. • Uncertainty: Decision based on incomplete or insufficient data. • Game: Decision based under conditions of conflict.
Ch 2.5: Areas of Uncertainty • Project timing & expected cash flow. • Direct outcome of project, i.e. what exactly will the project accomplish • Side effects and unforeseen consequences of project
Ch 2.6: Risk AnalysisCrystal Ball®2000 Software • Start with estimated risk profile for all key parameters of project • Use Crystal Ball®, an EXCEL® plug in, to represent decision by statistical model • Repeat many times to get a statistical distribution of all possible outcomes
Ch 2.6: Risk Analysis:Crystal Ball®2000 Software • Input of Cash Flow parameter from Psycho Ceramic example
Ch 2.6: Risk Analysis:Crystal Ball®2000 Software • Select distribution parameter(Triangular for this example)
Ch 2.6: Risk Analysis:Crystal Ball®2000 Software • Output, 1000 Monte Carlo Runs(example:Average Project NPV $10,821)
Ch. 2.6: Window-of-Opportunity Analysis • Estimate IN ADVANCE economic impact of innovation before R&D is undertaken • Set up a baseline of current process as the sum of all current sub processes • Compute cost / performance of new innovation as a multiple of each sub process in the baseline system
Ch. 2.6: Problems Affecting Data Used in PS Models • Accounting: arbitrary assignment of overhead costs, linear cost and revenue forecasts • Measurements: (subjective vs. objective), (quantitative vs. qualitative), (reliable vs. unreliable), (valid vs. invalid) • Technology shock: New technology has to overcome initial resistance threshold.
Ch 2.7: Project Portfolio Process (PPP) • Step 1: Establish a Project Council • Step 2: Identify Project Categories & Criteria • Step 3: Collect Project Data • Step 4: Assess Resource Availability • Step 5: Reduce Project and Criteria Set • Step 6: Prioritize Projects within Categories • Step 7: Prioritize the projects within categories • Step 8: Implement the Process
Ch 2.8: Project Proposal:Content • Cover letter • Executive summary • Description and past experience of project team • Nature of technical problem to be solved • How to approach solution of technical problem • Plan for implementation of project • Plan for logistic support and administration
Ch 2.8: Project Proposal:Cover letter & Executive summary • Compose a cover letter as key marketing instrument • Explain fundamental nature and general benefits of project • Minimally technical language
Ch 2.8: Project Proposal:Past Experience of Project Team • List all key project personnel with titles and qualifications • Include full resume of each principal • Provide all pertinent references
Ch 2.8: Project Proposal:Technical Approach • General description of problem to be addressed or project to be undertaken • Major subsystems of problem or project • Methodology of solving the problem • Special client requirements • Test and inspection procedures
Ch 2.8: Project Proposal:Implementation Plan • Estimates of time, cost and materials for each subsystem and the whole project • Establish major milestones to break project into phases • List equipment, overhead and administrative cost • Develop contingency plans (incl. slack time)
Ch 2.8: Project Proposal:Plan for Administration and Logistic Support • Control over subcontractors • Nature and Timing of all reports (progress, budget, audits) • Change management • Termination Procedures • “touch of class” capabilities (artist’s renderings, meeting facilities, video conferencing, computer graphics)