1 / 9

3 RD ALTERNATIVE ENERGY & POWER ASIA CONFERENCE – 28 th March 09

3 RD ALTERNATIVE ENERGY & POWER ASIA CONFERENCE – 28 th March 09. WIND ENERGY OPPORTUNITIES & CHALLENGES . IRFAN AFZAL MIRZA DG (TECH) AEDB Irfanmirza@aedb.org www.aedb.org. SEQUENCE . Potential of Renewable Energy in Pakistan Current Status in the world Wind Energy Market

javan
Download Presentation

3 RD ALTERNATIVE ENERGY & POWER ASIA CONFERENCE – 28 th March 09

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3RD ALTERNATIVE ENERGY & POWER ASIA CONFERENCE – 28th March 09 WIND ENERGYOPPORTUNITIES & CHALLENGES IRFAN AFZAL MIRZA DG (TECH) AEDB Irfanmirza@aedb.org www.aedb.org

  2. SEQUENCE • Potential of Renewable Energy in Pakistan • Current Status in the world • Wind Energy Market • Opportunities • Stake Holders Perspective

  3. WIND ENERGY MARKET • Wind energy continued its growth in 2008 at an increased rate of 29 %. • The wind sector became a global job generator and has created 440’000 jobs worldwide. • The wind sector represented in 2008 a turnover of 40 billion Euro • China continues its role as the most dynamic wind market in the year 2008, more than doubling the installations for the third time in a row, with today more than12,000 MW of wind turbines installed. • Based on accelerated development and further improved policies, a global capacity of more than 1’500’000 MW is possible by the year 2020.

  4. OPPORTUNITIES Technology Developers Capital Equipment Providers Manufacturers System Integrators/Application Developers Project Developers Service Providers Government 7

  5. STAKE HOLDERS PERSPECTIVE • INVESTOR • NEPRA • UTILITY • FINANCIAL INSTITUTIONS • GOVERNMENT OF SINDH • GOVERNMENT OF PAKISTAN AEDB

  6. Thank you