240 likes | 343 Views
Demonstrating the Need for Improved Facilities in Folsom. Measure C (2002). Projects Folsom High (Phase III) Sandra J. Gallado Elementary School Russell Ranch Elementary School Vista del Lago High School
E N D
Measure C (2002) • Projects • Folsom High (Phase III) • Sandra J. Gallado Elementary School • Russell Ranch Elementary School • Vista del Lago High School • Renovations at Theodore Judah Elementary, Blanche Sprentz Elementary, Sutter Middle and Folsom Middle
Facility Needs Assessment • Folsom schools are lacking up-to-date technology. • Outstanding comprehensive programs require state-of-the-art facilities. • Safety and security is a priority.
Improvement Categories • Classrooms & Instructional Areas • Technology • Safety & Security • Support Facilities
Classroom/Instructional Areas: • Provide additional instructional space • Replace/repair portable classrooms • Replace/repair heating, ventilation and air conditioning systems to be energy efficient • Replace interior finishes and flooring • Repair/replace furniture and equipment • Paint interiors and exterior • Upgrade low voltage systems (phone, clock, intrusion, fire alarm) • Replace/repair roofing, gutters and downspouts • Renovate student restrooms • Replace playground equipment/apparatus • Provide shade structures
Technology: • Upgrade classroom technology • Interactive classrooms • Mobile device technology • LCD projectors and new computers • Upgrade technology distribution systems, including wireless access, servers and switches • Provide projection system in the multipurpose buildings • Install digital marquees
Flipped Classroom- Expanding Teaching Time through Online Videos
Flipped Classroom- Expanding Teaching Time through Online Videos
Safety/Security: • Replace door hardware to lock from inside • Install security equipment and video surveillance • Fencing • Gates • Lighting • Lock down capability • Emergency access and response • Campus-wide alert, and shelter-in-place • Improve traffic/parent/student flow issues
Support Facilities • Renovate fields, landscape and irrigation systems • Continue to upgrade disability access throughout the sites • Upgrade Energy Management Systems (EMS) and add EMS to portable classrooms • Multipurpose buildings • Outdoor learning areas • Improve hardcourts and parking lots • Update exterior lighting systems for energy efficiency
Engagement Team Debbie Bettencourt (Superintendent) Rhonda Crawford (CFO/CBO) Sarah Gould (Parent) Michael Itkoff (FCEA) Tyler Johnstone (FMS Teacher) Andy Morin (Folsom City Council) Stephen Nichols (Communication) Lukas Novak (Student Board Member) Keri Phillips (SMS Principal) School Board Members Rob Thomas (CSEA) Matt Washburn (Facilities & Planning)
Where do we go from here? • Folsom teachers & staff • Elected officials/key influencers • Active & engaged parents (PTA/PTO, Site Council, etc) • Folsom parents with students enrolled in FCUSD • External parties (Folsom residents without school-aged children) • Young Folsom residents
Questions? • Contact us: • Debbie Bettencourt • Rhonda Crawford • Matt Washburn • Stephen Nichols • Folsom Cordova Schools1965 Birkmont DriveRancho Cordova, CA 95742916-294-9000