60 likes | 149 Views
T- 489 Status Report 4/5/07. Yesterday:. 10am: access to ESA to retrieve Fe samples and place Ti-alloy samples Irradiation for 3.5hrs 2:00 pm : access to ESA to retrieve downstream Fe samples Continuous gamma spectrometry and dose
E N D
T- 489Status Report 4/5/07 Yesterday: • 10am: access to ESA to retrieve Fe • samples and place Ti-alloy samples • Irradiation for 3.5hrs • 2:00 pm: access to ESA to retrieve downstream Fe samples • Continuous gamma spectrometry and dose rate measurements in building 24
Gamma Spectra Measurements Dose Rate Measurements B24 Measurements
Dose rates to be measured over a period of 1000 hours (until May 15, 2007) Short term sample activation levels at ~10 mSv/hr (1mR/hr) on contact Samples Species: Cu, Al, Fe, Ti, TiAlV, SS, dirt, concrete, water B24 Measurements
Check of CID Toroid with respect to CID Faraday Cup (10% agreement) Likely to do a post experiment calibration of AB01 Toro 4140 AB01 Toroids
Schedule for today: • 10am: take out Ti-Alloy and Steel Reference samples put in Al lateral and downstream and Steel Reference samples • Irradiation for 4hrs • 2pm: access to ESA to retrieve Al downstream sample • Continuous gamma spectrometry and dose rate measurements in • building 24 • Will run through weekend until 7:00 AM Monday (09-May-2007)