Regional Management Team Meeting Update - December 11, 2018

This update covers the production status of field plots, data collection models, certification plans, P2+ field certification, urban implementation, and the future of digital data collection. It also discusses the nationalization of FIA's regional field guides.

jchambers
Download Presentation

Regional Management Team Meeting Update - December 11, 2018

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Group Leader Update Bob Ilgenfritz Data Collection December 11, 2018 Regional Management Team Meeting Manhattan, KS

  2. Production Status Field Plots • Maintain base intensity and intensifications • Continue on time delivery of 7 year and 5 year annual sub cycles • Maintain 1/8 subsample of Forest Ecosystem Variables: P2+ and P2+ Soils • Support expansion toward all lands inventory • Urban first step • Urban full implementation 2021?

  3. HOW WE GET THE WORK DONENRS DATA COLLECTION MODELS • Federal employees in Data Collection staff • 49 total – 2 current vacancies • Moving toward fewer federal data collectors with more specialized work – ICE, State Reporting, QA, certification, summer window protocols, and contractor inspection responsibilities. • State employee data collection thru RJVA– IN and ME 15 to 20 employees • State administered contractors thru RJVA– MN, WI, SD • 20 to 25 contractors

  4. NRS DATA COLLECTION MODELS • Federal administered contracts – 20 contractors • Federal 5 Year Contracts – Old Model grandfathered • 8 Expiring over the next three years • Federal BPA Contracts – New Model with 2019 calls • NYC/Bridgeport CT and statewide CT urban • Pittsburgh/Cleveland/DC/Statewide WV urban • Lincoln NE urban and Southern IA and NC IL P2 • Eastern NY P2 • ND statewide P2/urban • Southern OH P2 • Black Hills National Forest accelerated base panels

  5. Figure 30. Multiple forks originating from the same area. In cases such as this the diameter is taken low and all stems are treated as one tree. FY 2019 Certification Plans Implement national Field Guide v8.0 • Changed LAND COVER CLASS to LAND COVER • removed Land Use from Land Cover • Changes/clarifications to tree forking rules • Measure low approach

  6. FY 2019 Certification Plans P2+ Field Certification • Planned P2+ field certification – first in 5 or 6 years • Status of soils measurements • All states have completed first 1/16 sample • Expanding sample to second 1/16 toward 1/8 • After we have soils samples on 1/8 of all plots: • Start remeasurement of original 1/16 or increase sample to next 1/16 toward 3/16? • Summer 2022 5 yr. cycle states: Maine, Minnesota, New Jersey

  7. Urban Implementation 2019 Impacts of Newtown Square office closure and unknown employee transfer of station costs: • No expansion of new target cities in FY 2019 • Statewide urban in MI, IL, and MO in FY 2019

  8. Urban Future FY 2020?: • Boston & statewide MA • Manchester & statewide NH • Sioux Falls & statewide SD • Toledo • Columbus

  9. Urban Future FY 2021?: • Omaha & statewide NE • Cincinnati & statewide OH • Fort Wayne & Indianapolis & statewide IN • KS statewide • NY statewide • PA statewide

  10. Digital Data Collection or “Paperless” Data entry Image/Maps/Plot sheet display

  11. Digital Data Collection or “Paperless” • Limited IM support for developing the tool necessary until recently. • Development of tool is national in scope • Need 500 units nationally & approximately 100 at NRS • Two piece approach requires replacing current laptops with GTAC tablet • Chief Information Office (CIO) financial support • GTAC currently not on the USDA procurement list • Waiver to purchase has been submitted

  12. ICE – Image Change Estimation • Started at NRS in 2015 in NH and VT • Completed by 12 field and 6 prefield employees • Equivalent of 1.75 FTE (Full Time Employee Equivalents) • All but three states SD, PA, ME, have completed the first cycle of interpretations • SD and PA are in process • ME waiting on 2018 imagery start January 2019 • Target completion of baseline interpretations by April 1, 2019

  13. ICE – Image Change Estimation • Time 2 Remeasurement - Quicker that Time 1 • No image change is observed. • Time 1 Land Use/Land Cover assessments are assigned to time 2 • Image change observed. • Assign new interpretation data on Land Use/Land Cover to time 2 • Time 2 Remeasurement hasn’t started, but will in FY 2019

  14. A Tree is a Tree

  15. Combining Current FIA Species Lists Make All Species Valid in all States on all Plot Types Implementation: NRS = FG 8.1 2020……….Nationally still being discussed. Pacific (App 14) Chester County PA Planning Commission Urban (App 3b) FIA Species List ( New App 3) P2 Includes Caribbean (App 3a)

  16. Nationalizing the National Field Guide • Forward Nationalization (think regional; act national… the goal is one robust system) • Develop, implement and use all national systems, processes, procedures, AND sunset all regional as national’s come on line. There can only be • One Manual, One Processing engine, One Database, One Estimate, Etc. • DAB QA team created to serve 2 functions • A standing team to address regional / national field procedures issues in a nationally consistent fashion. • Work towards “Nationalizing” FIA’s 4 Regional Field Guides 4 Regions Operating as One National Program 1

  17. USDA Forest Service, Remote Sensing Applications Center, http://fsweb.rsac.fs.fed.us