170 likes | 181 Views
Explore effective strategies for Rabi crop management in Mizoram to enhance productivity and production. Learn about initiatives to increase area coverage and promote high-yield variety seeds and sustainable farming practices.
E N D
NATIONAL CONFERENCE ON AGRICULTURE FOR RABI CAMPAIGN -2013-14. GROUP-II Strategies for Rabi crops management to increase productivity and production DEPARTMENT OF AGRICULTURE GOVERNMENT OF MIZORAM
Geographical Area :21,087 Sq km Population :10,97,206 (2011 census ) Male :5,55,339 (50.61%) Female :5,41,876 (49.38%) Population density :52 person/Sq Km District :8 Nos R.D.Block :26 Nos WRC Potential Area available : 74,644 Ha WRC Area under cultivation : 13,646 Ha Oil Palm Potential Area : 1,01,000 Ha Area under Oil Palm cultivation : 13,056 Ha. MIZORAM PROFILE MIZORAM
Weather Scenario: Rainfall in mm • Cumulative monsoon in the state as on 30th August 2013 was in excess of 1.63 per cent over 2012. Therefore, normal crop production is expected from Kharif crops . • There is no major outbreak of disease and pest. • Prospects of Kharif Maize, pulses and Oil seeds seems to be promising.
Assessment of Kharif, 2013-14 Area and Production of Kharif crop (Advance estimate)
Target Area and Production of Rabi Crops RABI PROSPECT
STRATEGY FOR CROP MANAGEMENT FOR RABI, 2013-14 • Expansion of Area under summer Rice with a targeted additional production of 5,600 MT. • Expansion of Area under Rabi Maize with a targeted additional production of 1,500 MT. • Additional area coverage of 2,150 Hectares under Rabi Pulse and Oil seeds with increase production. • Strengthening Farmers Field school through NFSM-Rice and RKVY. • Promotion of Farm Mechanization through establishment of custom hiring center at three locations to ensure timely farm operations. • Conducting state wide campaign for seed treatment for Rabi crops. • Promotion and popularization of HYV seeds of Rice, Maize, Pulses and Oilseeds to achieve the desirable seed replacement.
STRATEGY FOR CROP MANAGEMENT FOR RABI, 2013-14 Seeds: • Seeds requirement of improved variety of paddy (CAU R-1), pulses (F.Pea - Arkel &Rajma- Arka Anup & Arka Kamal) and oil seeds (M-27) have been finalized and procurement of seeds is under process. INM: • The total Fertilizer requirement for Rabi, 2013 (Urea-1000 MT, DAP-500 MT, MOP-500 MT and SSP-800 MT) has been approved by the Govt. of India. • Bio-fertilizers like Rhizobium, Azatobacter, Phosphorous Solubilizing Microbes etc. will be promoted as a component of INM to ensure balance and integrated use of fertilizer. • Slaked Lime will be distributed to Farmers at subsidized rate to improve crop productivity. IPM: • Integrated Pest Management will be popularized through adoption of Bio-control agents like Trichoderma, Pseudomonas and Trichograma.
ISSUES OF CONCERN • Low productivity: Rice productivity per Ha. (2012-13) is 1460 kg per Ha. which is well below the National average of 2240 kg. per Ha. • Small & Marginal land holding: Average land holding is only 0.50 Ha against National average of 1.33 hectare. • Low consumption of Fertilizer: Average fertilizer consumption is only 78.50 kg. per Ha. against National average of 129 kg. per hectare. • Negligible application of Micronutrients as only 3.20 % of gross cropped area is covered with Micronutrients. • Availability of Farm power is only 0.75 Kw. Per Ha against national average of 1.20 Kw per Ha. • Lack of proper farm Road connectivity is one of the major constraint for the development of Agriculture.
PARTNER COMPANIES(The implementing partner companies with areas allotted)
DISTRICT WISE AREA COVERED UNDER OIL PALM IN MIZORAM as on 30.8.2013
Progress of Oil Palm Mill • For Establishment of Oil Palm Mill, Govt. of India has sanctioned Assistance amounting to Rs. 750.00 lakh @ Rs. 250.00 lakh per Mill.
Recent Development for Establishment of Oil Palm Seed Garden : Selected Site :Chuanchung ram, West Serzawl, Mamit District. (Three Sr. Scientist from DOPR visited two proposed sites during 30th May to 3rd June,2013) Area : 50 Ha. Approach road for : 3.5 Km Construction Project Amount : Rs.536.53 lakh. Funding source : ICAR through Directorate of Oil Palm Research.