Integration of Safety into Design

Integration of Safety into Design. Dick Englehart Office of Nuclear and Facility Safety Policy. Background. Assumptions in design/safety at early stage Examples SWPF at SRS CMRR at LANL PSF at PNNL Dec. 7, 2005 DNFSB public meeting

jeanne
Download Presentation

Integration of Safety into Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integration of Safety into Design Dick Englehart Office of Nuclear and Facility Safety Policy

  2. Background • Assumptions in design/safety at early stage • Examples • SWPF at SRS • CMRR at LANL • PSF at PNNL • Dec. 7, 2005 DNFSB public meeting • Deputy Secretary direction for EH to review existing safety directives; revise as necessary to provide clear guidance

  3. Background (continued) • SAWG SG/DOE meeting, November, 05 • Amerine (EFCOG chair) letter of 12/22/06 offering EFCOG assistance re O 413.3 (PMWG and SAWG) • EH response to Dep. Sec. direction • 3009 for PDSAs, including process of design/safety analyses integration and format and content of PDSA, as a function of CD stage • Working group development process similar to that used for development of 3009

  4. Development Process • Form working group (order of 20 people) • Experienced with the integration process • Can write • Can commit to degree of participation necessary • 3 to 4 meetings of whole WG • Collect and review existing guidance documents • Discuss format and content of standard; develop table of contents • Discuss content of each section • Assign writers • Develop and integrate drafts of sections • Review and revise sections as necessary

  5. Other Considerations • Expected schedule is 12 to 18 months for final draft • Participants will largely have to be supported by their own organizations • Administrative/coordinating/integration support staff for EH