1 / 9

Request for Quotation 2G Multivendor Optimization Service

Request for Quotation 2G Multivendor Optimization Service. NSN Planning & Optimization. General Information. To optimize and achieve the 2G OSS performance target in 3 pilot clusters within 2 months for Aktel Bangladesh

jena
Download Presentation

Request for Quotation 2G Multivendor Optimization Service

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Request for Quotation 2G Multivendor Optimization Service NSN Planning & Optimization

  2. General Information • To optimize and achieve the 2G OSS performance target in 3 pilot clusters within 2 months for Aktel Bangladesh • The selected pilot clusters are from 3 different vendors (non NSN equipments), and are from totally separate regions (in Chittagong City) • The Site & BTS counts for each pilot cluster is given in table below: • The border for each pilot cluster are given in subsequent sizes • The OSS system is centralized in Dhaka

  3. Pilot Cluster Reference Cluster ALU – Pilot Cluster CB97

  4. Pilot Cluster Reference Cluster Ericsson – Pilot Cluster CB29

  5. Pilot Cluster Reference Cluster Huawei – Pilot Cluster CB80

  6. Scopes Requirements • To provide the measurement tools and resources for the optimization services • The main task include: • Liaise with the customer team to acquire the network data like OSS performance statistic, parameters data etc which require for the optimization activities • Monitor and analyze the OSS static data • Perform the drive testing for the clusters • Analyzing and Reporting • Ultimately to achieve the require KPIs target in each pilot cluster

  7. KPIs Target • Following is the KPIs target for the project

  8. Assumption on this case • Customer will provide the following technical team : • Configuration team (RNC and NOC engineers). This team to execute day to day parameter changing. • OSS team to collect data and provide data statistics and parameters dumps.

  9. Quotation and Org Chart Requirement • Please provide the quotation (all inclusive rate) in following format: • Please provide the resource HC in each of the pilot clusters • In addition, please provide the daily/monthly subcon rate for following:

More Related