1 / 4

ENA - Biomethane Campaign Working Group

ENA - Biomethane Campaign Working Group. NIA Projects - Update. Siloxane - Online Analyser. Scope: To demonstrate the suitability (or otherwise) of this analytical technique for protecting the UK GDNs. Why:

Download Presentation

ENA - Biomethane Campaign Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENA - Biomethane Campaign Working Group NIA Projects - Update

  2. Siloxane - Online Analyser • Scope: • To demonstrate the suitability (or otherwise) of this analytical technique for protecting the UK GDNs. • Why: • If Total Silicon limits are imposed by the HSE, GDNs will need to demonstrate compliance through the use of accurate analytical techniques/equipment. • The role of DNV GL: • DNV GL have scoped out a project to assess the performance of a siloxane analyser in the laboratory and during a field trial at Severn Trent Minworth Bio methane plant. Testing on bio methane derived from waste water treatment plant will provide a robust and stringent test of the equipment. • Progress to-date: • Sanction paperwork sent for fast track approval on 5th August 14. • Meeting held with Seven Trent Water o site to finalise proposal • PEA will be registered as soon as possible after sanction. • Purchase Order to be placed in mid September with first installation of FTIR analyser in October

  3. UK Siloxane Impact Study – Domestic Appliances • Determine hierarchy of effects for UK domestic appliances ranging from “nuisance” to “risk for safe operation” during the lifetime of the appliance • Flame safety device, power reduction, window opacity (fires), CO emissions, etc. • Perform experiments at four different siloxane concentrations for each selected appliance and analyze results based on earlier experience and analysis extrapolate to possible specification levels • Choice of appliances proposed with ENA and British Trade Association • Possible ‘pre-examination’ to select sensitive appliances • The experimental design and analysis is aimed at a method of extrapolation that is consistent with and/or verified by experimental results • Final deliverable is hierarchy of effects in time at three potential specification levels: • – 0.05, 0.1 and 0.5 mg Si/m3 (chosen with ENA)  dose/effect results: time-to-effect at different concentrations • Note: discussion of the project content, budget options and planning is in “Outline Proposal and Budget Estimate for ENA Siloxane Impact Study; Domestic Appliances” (16 December 2013)

  4. UK Siloxane Impact Study – Domestic Appliances • Total NIA cost £353,495 inclusive of cost to purchase appliances, two possibilities: • Costs include fuel consumption, siloxanes, analyses; exclude costs of appliances, travel costs and VAT. • Length of project: 18 months – 4 phases. • Phase 1 – 2 months – Development of test program • Phase 2 – 3 months – Pre examination • Phase 3 – 12 months – Experiments on selected appliances • Phase 4 – 3 months – Analysis of the impact of silica deposition on appliance performance • Sanction paperwork sent for review – to be tabled at 18th August IPG • Collaborative with SGN & NGN • Draft Contract sent to all parties . • PEA and cost split agreed by all parties. • Order to be placed in September

More Related