1 / 3

ENERGY POLICY ISSUES POWER GENERATION

ENERGY POLICY ISSUES POWER GENERATION. RENEWABLE REQUIREMENT TARGETS VARIES BY STATE, LOCAL REGULATORS WIND ENERGY PEAK DAY ISSUE, MUST BE SUBSIDIZED SOLAR ENERGY TECHNOLOGY ISSUE, MUST BE SUBSIDIZED NUCLEAR ENERGY WASTE DISPOSAL ISSUE COAL ENVIRONMENTAL ISSUE NATURAL GAS

jenna
Download Presentation

ENERGY POLICY ISSUES POWER GENERATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENERGY POLICY ISSUESPOWER GENERATION • RENEWABLE REQUIREMENT TARGETS • VARIES BY STATE, LOCAL REGULATORS • WIND ENERGY • PEAK DAY ISSUE, MUST BE SUBSIDIZED • SOLAR ENERGY • TECHNOLOGY ISSUE, MUST BE SUBSIDIZED • NUCLEAR ENERGY • WASTE DISPOSAL ISSUE • COAL • ENVIRONMENTAL ISSUE • NATURAL GAS • FASTEST GROWING • HYDRO • LEAST EXPENSIVE • BUILDING CODES • REDUCE DEMAND • CAP AND TRADE • VERY COMPLEX AND EXPENSIVE

  2. ENERGY POLICY ISSUESTRANSPORTATION FUELS • CAFE STANDARDS • 54.5 MPG BY 2025 • DRILLING PERMITS • OFF-SHORE, FEDERAL LANDS • ANWR • ENVIRONMENTAL OBJECTIONS • ELECTRIC VEHICLES • REQUIRE SUBSIDY AND INFRASTRUCTURE DEVELOPMENT • NGVs • REQUIRES INFRASTRUCTURE DEVELOPMENT • ETHANOL • UNINTENDED IMPACT ON FOOD COSTS • KEYSTONE XL PIPELINE • APPROX. 500,000 BBLs PER DAY

  3. FUELS FOR POWER GENERATIONU.S.-- 2012 • HYDRO 7% • COAL 37% • NATURAL GAS 30% • NUCLEAR 19% • WIND 3.5% • SOLAR 0.1% • OTHER 3.4%

More Related