An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Surface Treatment Multi Agencies Collaboration

  2. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance Section Benton County Department of Transportation Private Contractors

  3. 2010 Surface Treatment Projects Highway 34 From Milepost 7.0- Milepost 14.0 Highway 226 From Milepost 13.5-Milepost 16.0

  4. Oregon Department of Transportation Responsibilities • Materials Contracts • Iron Mountain Chip Seal Rock 3/8-1/4, • Liquid Asphalt-HFRS-1P • Testing of Materials

  5. Oregon Department of Transportation Responsibilities • Stockpile Site Preparation • Stockpile Chip Seal Rock • Monitor Stockpile Moisture Content • Stockpile Location Cleanup

  6. Oregon Department of Transportation Responsibilities • Front End Loader and Operator • Three Roller Operators • One Pneumatic Roller (Rental/within ODOT) • Six Ten Yard Trucks and Drivers • 2000 gal. Water Truck • Open Air Broom and Operator • Broom Shadow Vehicle and Operator

  7. Oregon Department of Transportation Responsibilities • VMS Boards placed for advanced warning • Stick and Stomps and Setter Prior to start of Project • Work Zone Signage and Set up • Pilot Cars and Operators • Stick and Stomp Tab Cover Removal

  8. Benton County Department of Transportation Responsibilities • Materials Contract (Freight/Distributors) • Daily Ordering of Materials • Material Samples for Testing

  9. Benton County Department of Transportation Responsibilities • 2000 Gallon Liquid Asphalt Distributor and Operator ( as needed for chip seal and fog seal) • Chip Spreader with Operator and Dump Boss/Belt Operator • Pneumatic Roller and Steel Wheel Single Drum • Ten Yard Dump Trucks( as needed) • Open Air Broom ( as needed) • Specialty Signs ( Loose Rock, Fresh Oil)

  10. Contractor Responsibilities • 4400 Gallon Liquid Asphalt Distributor (Chip Seal and Fog Seal, Albania) • Traffic Control Flaggers ( St Vincent's )

  11. Surface Treatment Multi Agency Collaboration • Benton County Chip Spreader • ODOT Ten Yard Truck

  12. Surface Treatment Multi Agency Collaboration Contractor 4400 Gallon Liquid Asphalt Distributor

  13. Surface Treatment Multi Agency Collaboration • Benton County Rollers • ODOT Roller • ODOT Operators

  14. Surface Treatment Multi Agency Collaboration • ODOT Pilot Vehicle

  15. Surface Treatment Multi Agency Collaboration • ODOT Pilot Vehicle controlling traffic speeds through the work zone.

  16. Estimated Costs for Hwy 34 • Cost per mile $37,200 • Cost per sq yd $2.65