Dinagat Elec. Coop

A Case Study. 440 kW Diesel Pwr Plant. North. 8hrs 410KW. Loreto Municipality. Dinagat Elec. Coop. NPC. 16 hrs 1050KW. South. 1430KW DPP. LGU. 440KW DPP. 350KW Hydro. Php. Dinagat Elec. Coop. North Area. 24hrs. Project Objective. 440 KW + 1430 KW DPP. A Case Study.

jerica
Download Presentation

Dinagat Elec. Coop

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Case Study 440 kW Diesel Pwr Plant North 8hrs 410KW Loreto Municipality Dinagat Elec. Coop NPC 16 hrs 1050KW South 1430KW DPP

  2. LGU 440KW DPP 350KW Hydro Php Dinagat Elec. Coop North Area 24hrs Project Objective

  3. 440 KW + 1430 KW DPP A Case Study 8hrs Loreto Municipality Dinagat Elec. Coop NPC 24 hrs LGU 350KW

  4. DBP NRE Project (mini hydro) - A potential CDM Project Php DBP LGU

  5. Loan Term Sheet Amount: 40,000,000.00 (Equity: 10% of Project Cost) Tenor : 15 yrs Interest: AAA category (8%.- 8.5%) Quarterly Payments Principal: 3 yr. Grace Quarterly Payment Security: I.R.A.Assignment PPA Assignment Asset Insurance Fund Source: DBP

  6. Major DBP Requirements in the Project 1. Reconnaissance Permit 2. Feasibility Study 2. E.C.C. or CNC / IPR / NWRB 3. Financial and Economic Analysis 4. Borrowers Financial Statements 5. Consultant’s Credentials 6. Formal Letter of Proposal/ Application 7. Appropriate DBP Forms Back to Main Page