Report on mechanical tests and possible operation scheme of the liquid recirculation for ARGONTUBE. Internal meeting 31/01/2007. Mechanical test with rings at LHEP. Contacts with HBB Biegetechnik able to make the rings Order placed (receive rings in 2 weeks)
E N D
Report on mechanical testsand possible operation scheme of the liquid recirculation for ARGONTUBE Internal meeting 31/01/2007
Mechanical test with rings at LHEP Contacts with HBB Biegetechnik able to make the rings Order placed (receive rings in 2 weeks) Soon after realize the prototype
Vacuum pump LN Ar tank Ar tank Oxysorb Oxysorb Hydrosorb Hydrosorb Possible operation scheme