An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LEADER WP6 technical meeting Karlsruhe November 22nd 2012

  2. WP6: Lead Technology (KIT) Start Month: 1 – End month: 36 Lead participant: KIT Participants: CEA , CIRTEN, ANSALDO - MERIVUS, ENEA, KIT, UJV Total effort: 79 PM The work concentrates on topics to ensure the basic technologies of the project and to establish programs and priorities of co-operation with partner of GENIV and ROSATOM. The WP is organized in 5 Tasks: 4 Tasks address several specific technological issues directly linked to the coolant Task No 5 is or was? dedicated to knowledge exchange with ROSATOM – new information today

  3. Objectives of WP6 Task 1: Material for heat transfer components Determine important mechanical properties of T91 with and without surface protection like creep and stress in combination with Pb of materials for heat transfer components Task 2: Materials for mechanical pump Test promising pump materials under realistic conditions Task 3: Oxygen control and purification strategy Collection and assessment of available information concerning monitoring and control of the oxygen activity in a pool type reactor and purification of lead during plant operation Task 4: Damping pressure waves inside the SG Investigate and asses the damping of pressure waves by SGTR event Task 5: Scientific and technology collaboration with ROSATOM institutions Cooperation (exchange of knowledge and joint technological efforts) with the ROSATOM project in specific topics.

  4. 30 MM in Karlsruhe Gant Chart of WP6 D, T and MS until KIT meeting Kick-Off in Genova April 22nd M06, T09, T13 D12 M24 - D12 – Task 6.3 - Compilation of existing data on the liquid lead oxygen control strategy – CEA, ENEA, KIT – Draft – Mid of December by Christian to Alessandro and Alfons Final version – March 2013 M30 - T09 – Task 6.1 - Heat transfer properties – KIT – draft report in preparation – parts are ready - some additional measurements (Laser flash) are in planning and preparation Final version February 2013 M30 - T13 - Task 6.1 - Surface aluminizing of steam generator components – in preparation – translation of compact version of master thesis KIT - availabe in December 2012 Milestone: M24 - M06 Task 6.4 - SG test facility commissioned – ENEA, CIRTEN, MERIVUS shift to M 28 nowM36

  5. 24 month‘s meeting in Madrid Gant Chart of WP6 D12 Kick-Off in Genova April 22nd D, T until end of project M06, T09, T13 T17, D16, D33, D23, D24 M36 - D16 – Task 6.2 - Erosion stability of materials in fast flowing lead – ENEA, KIT M36 - D33 – Task 6.1 - Summary of HLM reactors materials – KIT M36 - T17 – Task 6.1 - Influence of lead on mechanical properties – KIT, ENEA, UJV M36 - D23 – Task 6.4 - Tests report on the performance of the proposed pressure wave damping system – ENEA, CIRTEN, ANSALDO now shifted to M36 + 6! M36 - D24 – Task 6.5 - Summary of the complementary and common work of EU – partners and ROSATOM institutions based on the deliverables containing the ROSATOM contribution - ENEA, CEA, KIT

  6. Planning of Deliverables and Technical reports

  7. LEADER WP6 AGENDA – Madrid May 10th Draft – AGENDA of WP6 meeting in Karlsruhe November 11th 2012 14:00General Overview Status of WP6 (Deliverables, Milestones, Problems) – G. Müller 14:10 Task 6.1 A. Weisenburger (KIT) overview + some results with contributions from ENEA 14:40 Task 6.2 M. Tarantino (ENEA) overview and status of work A. Weisenburger (KIT) - status of work (very short) 15:15 Task 6.3 A. Weisenburger(KIT) status of work - dedicated meeting at Cadarache 15:30 – 15:45 Coffee break 15:45 Task 6.4 M. Tarantino (ENEA) overview and status of work 16:15 Task 6.5 A. Alemberti and G. Müller information on actual status of negotiations with ROSATOM

  8. Problems, delays, deviations? Task 6.1 – T09 – Task 6.1 - Heat transfer properties – KIT draft was foreseen at M24 - some additional diffusivity measurements are planned / e.g. T91 exposed in Pb to see the influence of Pb on diffusivity (Pb penetrates the magenetite scale) Draft of T09 (almost complete document) planned M30 Task 6.2 – ENEA has adapted the working program – Asked for extension of 6 month’s Experiments will start in April 2013 - KIT has rebuild the CORELLA / Tests will start December 2012 2000 h test will finish beginning of March – post examination ready for end of LEADER D16 “Erosion stability of materials in fast flowing lead“ needs to be shifted by additional 6 months (extension of this Task) Task 6.3 – 2nd meeting - CEA , KIT, ANSALDO, ENEA (video) in Cadarache July 5-6 Intensive discussion about control strategy – Draft minutes circulated - Content of Deliverable is agreed – also share of work 1st draft Mid of December – March 2013 final version Task 6.4 – Milestone was shifted to Month 28 – status of work will be given today Task 6.5 negotiations how to proceed are still ongoing – A. AlembertiG. Müller