1 / 4

LEADER WP6 PPC meeting Karlsruhe November 23 rd 2012

LEADER WP6 PPC meeting Karlsruhe November 23 rd 2012. Main Results of WP6. Task 1: Material for heat transfer components The thresshold stress/strain below which influence of Pb is neglectable was estimated from creep tests at 550 °C – 120 MPA/ strain 2-4%

duer
Download Presentation

LEADER WP6 PPC meeting Karlsruhe November 23 rd 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LEADER WP6 PPC meeting Karlsruhe November 23rd 2012

  2. Main Results of WP6 Task 1: Material for heat transfer components • The thresshold stress/strain below which influence of Pb is neglectable was estimated from creep tests at 550 °C – 120 MPA/ strain 2-4% • The heat conductivity of T91 for the ´normal´ (FeCr)- oxide scales was measured – in the temperature range 350 – 500 °C the value is by ~50 % larger than values from literature. To proof the data additional experiments are planned. • The Cr-Al concentration for selective oxidation (alumina only) was estimated experimentally for the temperature range from 400 -600 °C. • Fretting maps for T91/T91 and 15-15Ti steels in lead were established as function of specific wear coeff.- load – amplitude. High load and small apmlitudes are most favorable to reduce the wear. Task 2: Materials for mechanical pump • HELENA –loop under construction at ENEA. Tests for pump materials will start in April 2013. Ta-coating will be tested first. • Refurbishment of CORELLA finished. Tests with rotation speed according to 10m/s successful. Tests with Maxthal, T91, SiSiC, Noriloy, GESA will start in December 2012.

  3. Main Results of WP6 Task 3: Oxygen control and purification strategy • Strategy on monitoring and control of the oxygen activity in a pool type reactor and purification of lead during plant operation were established. • Required oxygen amount was calculated. • KIT promised to do some estimation on tritium…. Task 4: Damping pressure waves inside the SG • LIFUS 5 passed the approval by safety authorities and is under commissioning. Experiments will start in March 2013. • Some issues on the experimental setup are still under discussions. Task 5: Scientific and technology collaboration with ROSATOM New CooA has been sent to RF nominated representatives in June 2012 and foresee a two days meeting to be organized preferably before march 2013 covering the four topics- now reaction from Russia up to now. At the EUROATOM/ROSATOM-Meeting in Brussels (Oct. 2012) it was promised by ROSATOM representative to reconsider our proposal….

  4. Planning of Deliverables and Technical reports