50 likes | 282 Views
Next Steps CBM Interim MoU. Walter F.J. Müller , GSI, Darmstadt 12 th CBM Collaboration Meeting 17 October 2008. Input so far – Status 14.10.2008. Start still not fully defined MVD still under work STS draft MUCH draft RICH draft TRD still under work STT draft TOF draft
E N D
Next Steps CBM Interim MoU Walter F.J. Müller, GSI, Darmstadt 12th CBM Collaboration Meeting17 October 2008
Input so far – Status 14.10.2008 • Start still not fully defined • MVD still under work • STS draft • MUCH draft • RICH draft • TRD still under work • STT draft • TOF draft • PSD draft • ECAL draft • Magnet draft • DAQ still under work • FLES still under work • Computing still under work • Controls still under work • Infrastructure still under work • Common Projects not yet defined 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI
Input so far – Status 17.10.2008 • Start still not fully defined • MVD draft available • STS draft • MUCH draft • RICH draft • TRD still under work • STT draft • TOF draft • PSD draft • ECAL draft • Magnet draft • DAQ still under work • FLES still under work • Computing still under work • Controls still under work • Infrastructure still under work • Common Projects not yet defined 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI
Next Steps • bring all drafts to 'common format' • assemble CBM IMoU draft • CBM Management Board will determine further steps 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI
The End Thanks for your attention 12th CBM Collaboration Meeting -- Walter F.J. Müller, GSI