1 / 4

Time Meeting Safety Topic EMS/OSH and Compliance Audit Results for C-AD

Time Meeting Safety Topic EMS/OSH and Compliance Audit Results for C-AD. Ray Karol 3/11/2013. Noteworthy Practices. C-AD and Waste Management assessed relocation of pump out station of D-waste in 801 from outside to inside (for spill management)

jerzy
Download Presentation

Time Meeting Safety Topic EMS/OSH and Compliance Audit Results for C-AD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Time Meeting Safety TopicEMS/OSH and Compliance Audit Results for C-AD Ray Karol 3/11/2013

  2. Noteworthy Practices • C-AD and Waste Management assessed relocation of pump out station of D-waste in 801 from outside to inside (for spill management) • C-AD evaluation of lessons learned from CERN cryogenic leak creating an oxygen deficient atmosphere: updated FRAs, Objectives & Targets and operational controls • C-AD making good progress gathering info to develop fact sheets on 49 historical beam loss locations in case they are ever decommissioned • C-AD conducts a review of noise areas and postings every 2 years (required every 3 years)

  3. Opportunities for Improvement • Consider incorporating C-AD fact sheets on historical beam loss locations into FUA’s • Determine retention schedule and assign records management responsibility for C-AD soil activation cap inspection checklists and maintenance records • Document cap condition with date-stamped photos and attach to inspection checklists

  4. Opportunities for Improvement • Update maps of beam loss locations with potential for soil activation and show areas that have been capped • Formally transfer BLIP inspection records from Medical Dept. to C-AD

More Related