1 / 27

Building Committee Presentation: JUNE 12, 2012 PRELIMINARY DESIGN PROGRAM

Building Committee Presentation: JUNE 12, 2012 PRELIMINARY DESIGN PROGRAM Hanson, MA | Whitman-Hanson Regional School District. Module 3 Preliminary Design Program CONTENTS. 1. INTRODUCTION 2. EDUCATIONAL PROGRAM 3. INITIAL SPACE SUMMARY 4. EVALUATION OF EXISTING CONDITIONS

jesse
Download Presentation

Building Committee Presentation: JUNE 12, 2012 PRELIMINARY DESIGN PROGRAM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Building Committee Presentation: JUNE 12, 2012 PRELIMINARY DESIGN PROGRAM Hanson, MA | Whitman-Hanson Regional School District

  2. Module 3 Preliminary Design Program CONTENTS 1. INTRODUCTION 2. EDUCATIONAL PROGRAM 3. INITIAL SPACE SUMMARY 4. EVALUATION OF EXISTING CONDITIONS 5. SITE DEVELOPMENT REQUIREMENTS 6. PRELIMINARY EVALUATION OF ALTERNATIVES 7. LOCAL ACTIONS AND APPROVALS APPENDIX

  3. Module 3 Preliminary Design Program 1. INTRODUCTION • Overview • Educational Facilities • 2. Project Initiation and Statement • Statement of Interest • Project Team • Enrollment Agreement • Narrative Summary of Capital Budget Statement • 4. Process and Schedule • Site visits • Public Outreach • Education Program • Initial Space Summary • 5. Summary of Findings, Existing Conditions • Site • Maquan School • Indian Head School

  4. Module 3 Preliminary Design Program 2. EDUCATIONAL PROGRAM • Overview • Current and Proposed Educational Program • Fit of Program to Physical Space • Educational Program • 3. Functional Diagrams

  5. Module 3 Preliminary Design Program 3. INITIAL SPACE SUMMARY • Overview • Process and Observations • Overview • Analysis of Existing Educational Facilities • Visionary Session and Summary Findings • Initial Assessment of Existing to Proposed (Matrix) • Initial Space Summary • Summary of Differences from MSBA Template • Space Summary Spreadsheets (PK-2 and PK-5)

  6. Module 3 Preliminary Design Program 3. INITIAL SPACE SUMMARY • Initial Space Summary • Summary of Differences from MSBA Template • Pre-Kindergarten • Multi Purpose Room (STEM/STEAM) • Special Needs • Enlarged Gym • Teacher Planning / Collaboration Centers • Space Summary Spreadsheets (PK-2 and PK-5) • PK-2 ProposedExisting • 90,834 GSF74,600 GSF • PK-5 ProposedExisting • 131,599 GSF144,490 GSF

  7. Module 3 Preliminary Design Program 4. EXISTING CONDITIONS • Introduction: Summary of Property Restrictions • Title and Deed • Appropriateness for Development • Development Restrictions • Historic Restrictions (Memorial Hall) • Maquan Existing Conditions • Indian Head Existing Conditions

  8. Module 3 Preliminary Design Program 5. Site Development Requirements • Introduction: Summary of Concerns • Site Development Requirements • Existing Site Plan

  9. Module 3 Preliminary Design Program 6. Evaluation of Alternatives • School District Assignment Practices • Tuition Agreements with Adjacent School Districts • Rental or Acquisition of Existing Buildings • Construction Options Overview • Construction Option Narrative Descriptions • 6. Construction Option Drawings • 7. Option Cost Comparison • 8. Options Comparison Chart • 9. Base Repair Option Costs for Indian Head

  10. Construction Option Drawings Option 1| Base Repair – Site Plan Maquan PK-2: A comprehensive renovation including code required upgrades, full accessibility, and a fire suppression system. Indian Head 3-5: Targeted improvements to correct known deficiencies. Approx. Costs: $32,038,947 Total $18,291,297 Hanson share Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  11. Construction Option Drawings Option 2| Renovation and Addition to Maquan with No, or Limited Demolition – Site Plan • Maquan PK-2: • No / Limited Demolition • Minor interior modifications • Comprehensive renovation including code required upgrades, full accessibility, and a fire suppression system. • New addition to meet the program requirements for Pre-K to grade 2. • Approx. Costs: • $34,750,899 Total • $18,160,486 Hanson share New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District Exact configuration of additions to be determined

  12. Construction Option Drawings Option 3| PK-2, Renovation and Addition to Maquan with Partial Demolition – Site Plan Maquan PK-2: Enrollment: 395 Demolition of the 1-story core Addition of a new 2-story core, Renovation of the existing 2-story classroom wing, for Pre-K to grade 2. Approx Costs: $35,993,551 Total $18,782,420 Hanson share New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  13. Construction Option Drawings Maquan Elementary School Feasibility Study Hanson, MA Option 3| PK-2, Renovation and Addition to Maquan with Partial Demolition – Building Plans LOWER LEVEL UPPER LEVEL

  14. Construction Option Drawings Option 4A| PK-2, New 2-Story School on Maquan Site – Site Plan Maquan PK-2: Enrollment: 395 A new 2-story school building on the Maquan site for Pre-K to grade 2. Demolition of existing Maquan School. Approx. Costs: $36,454,887 Total $17,867,654 Hanson share New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  15. Construction Option Drawings Maquan Elementary School Feasibility Study Hanson, MA Option 4A| PK-2, New 2-Story on Maquan Site – Building Plans LOWER LEVEL UPPER LEVEL

  16. Construction Option Drawings Option 4B| PK-2, New 2-Story School on Maquan Site – Site Plan Maquan PK-2: Enrollment: 395 A new 2-story school building on the Maquan site for Pre-K to grade 2. Demolition of existing Maquan School Approx. Costs: $36,454,887 Total $17,867,654 Hanson Share New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  17. Construction Option Drawings Maquan Elementary School Feasibility Study Hanson, MA Option 4B| PK-2, New 2-Story School on Maquan Site – Building Plans UPPER LEVEL LOWER LEVEL

  18. Construction Option Drawings Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Site Plan Combined PK-5: Enrollment: 800 Demolition of the Indian Head one story wing. New 2-story additions. Targeted renovation of the existing 2-story 1951 wing. Demolition or re-purposing of Maquan School Approx. Costs: $52,751,926 Total $26,362,010 Hanson share Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  19. Construction Option Drawings Maquan Elementary School Feasibility Study Hanson, MA Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Building Plan LOWER LEVEL

  20. Construction Option Drawings Maquan Elementary School Feasibility Study Hanson, MA Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Building Plans UPPER LEVEL MAIN LEVEL

  21. Construction Option Drawings Option 6A| New 2-Story School on Indian Head Site – Site Plan Combined PK-5: Enrollment: 800 A new 2-story building for Pre-K to grade 5 on the Indian Head site. Demolition or re-purposing of Maquan and Indian Head Schools Approx. Costs: $53,149,800 Total $26,529,668 Hanson share Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  22. Construction Option Drawings Maquan Elementary School Feasibility Study Hanson, MA Option 6A| New 2-Story School on Indian Head Site – Building Plans LOWER LEVEL UPPER LEVEL

  23. Construction Option Drawings Option 6B| New 2-Story School on Maquan Site- Site Plan Combined PK-5: Enrollment: 800 A new 2-story building for Pre-K to grade 5 on the Maquan site. Demolition of Maquan School and demolition of re-purposing of Indian Head School Approx. Costs: $53,149,800 Total $26,529,668 Hanson share New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  24. Construction Option Drawings Maquan Elementary School Feasibility Study Hanson, MA Option 6B| New 2-Story School on Maquan Site – Building Plans LOWER LEVEL UPPER LEVEL

  25. Module 3 Preliminary Design Program 6. Evaluation of Alternatives • Option Cost Comparison OptionTotal CostHanson Cost Base Repair $32,028,947 $18,291,297 (Not Including Indian Head Repairs) • Add. Reno. Maquan $34,750,899 $18,160,486 • (no demo) (Not Including Indian Head Repairs) • Add. Reno. Maquan $35,993,511 $18,782,420 • (partial demo) (Not Including Indian Head Repairs) • New school at Maquan $36,454,887 $17,867,654 • PK-2 (Not Including Indian Head Repairs) 5 Add. Reno. Indian Head $52,751,926 $26,362,010 (partial demo) PK-5 6 New School at Indian Head $53,149,800 $26,529,668 or Maquan, PK-5

  26. Module 3 Preliminary Design Program MOVING FORWARD • TO DO FOR MODULE 3.1: • Narrow Options to 3 and complete Executive Summary • Local Action Certification • TO DO FOR MODULE 3.2: • Joint Meeting with Selectmen and Historic Commission regarding Memorial Hall • Community Outreach as Defined by Town/District • Recreational Department Meeting(s) • Identify Preferred Solution (July 17-24) • Determine Funding Needed for Survey, Traffic, Hazmat and Soils • TO DO FOR MODULE 4: • Seek Town Funding Approval for Site Exploration at October Town Meeting

  27. Thank You

More Related