An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of HiLumi Lucio Rossi HiLumi LHC Project Coordinator – CERN HiLumi/LARP Collaboration Meeting CERN, 16 November

  2. Refining of the path and goals LRossi-16Nov2011

  3. Refining of the path and goals LS3 LRossi-16Nov2011

  4. First HL-LHC LIU meeting (June 2011) What we need as minimum in operative condition What LIU is aiming to: L4, PSB 2GeV, SPS up e-cloud suppression + … 25 ns: not that far: 15% more bunch population: but probably 30% needed 50 ns: is far, HL-LHC brightnessrequestmaybe out of reach, but…. LRossi-16Nov2011

  5. Tuning of the goal aftersummer Efficiency is defined as the ratio between the annual luminosity target of 250 fb-1 over the potential luminosity that can be reached with an ideal cycle run time with no stop for 150 days: trun= tlev+tdec+tturn. The turnaround time after a beam dump is taken as 5 hours, tdecay is 3 h while tlev depends on the total beam current LRossi-16Nov2011

  6. Cycle in the HL-LHC run 20E+34 pile up heatdeposition in IR and DS other? Levelling LRossi-16Nov2011

  7. Our Final Goal: 2000? – 3000? LRossi-16Nov2011

  8. Many changes : (IR Col, Cold Pw., Cryo for P4 and for P1-P5 not shown) LRossi-16Nov2011

  9. The HL composition DS collimation shifted in 2018 11 T is in baseline (if works) SC links gets support fromvariouscolaborations Matching section and correctors Collimation Project High Field Magnets R&D Beam Diagnostics HE-LHC Studies Study on HE-LHC getswider support EuCARD2 WP on HTS dipoles Hardware Commissioning LRossi-16Nov2011

  10. Status of the FP7 DS Grant Agreement signed by EU in October and now by all Beneficiaries First tranche of money (60% of the 4.9 M€) from EU has arrived to CERN, for redistribution(changedat a bad rate – for CERN ) Consortium Agreement almostready The US labs has not accepted the conditions LRossi-16Nov2011

  11. Staff for HiLumi LHC (EU FP7) LRossi-16Nov2011

  12. Staff HiLumiwith 377 p-m by US Labs 163 FTE-y LRossi-16Nov2011

  13. Werely on USA not only as «man-power»: intellectual contribution and skill are critical • And manyother contributions: • Collimation, e-lenses • Wires • Beam diagnostics… • AP ! http://hilumilhc.web.cern.ch/HiLumiLHC/ LRossi-16Nov2011

  14. HL-LHC and USA Necessity to find a way to formalize the collaboration for the Design Study Necessity to formalize the intention of a long term contribution To provide «in kind» by 2020: a plan and agreement isneedednow. Must beincludedalso the 11 T, the CC and Collimation + … Howeverwefullyinclude US labs to ourgovernance: 6 US members in the CB of HL-LHC of Thurday 17 Nov (5 labs + DOE), withformally no vote on FP7 HiLumi LHC «internalbusinness». LRossi-16Nov2011