EP BIH. Company profile. G eneration , distribution & supply of electricity Established in 1946 Share Capital 1.1 4 4 billion EUR (90 % state & 10 % private share) Operates with 2 TPPs, 3 HPPs & 8 small HPPs The biggest company in B&H. Company structure. Generation.
E N D
Company profile • Generation, distribution & supply of electricity • Established in 1946 • Share Capital 1.144 billion EUR (90 % state & 10 % private share) • Operates with 2 TPPs, 3 HPPs & 8 small HPPs • The biggest company in B&H
Company structure Generation Distribution & Supply TPP Tuzla TPP Kakanj HPP on Neretva ED Bihac ED Tuzla ED Zenica EDSarajevo • 90% state • 10% private ED Mostar
Current facts 2012
Balance Sheet 2012(€ million) *excluding coal mines
Production indicators Reduced production in 2012: due to reconstruction of Unit 6 in TPP Tuzla
Production and coal supply Thermal power generation is dominant and is participating in total production between 70 – 80% Hydro power generation is inferior and is participating in total production between 20 – 30% EPBiH is 100% owner of seven coal mines within FBiH More than 85% of the total coal is produced within own coal mines Price of coal is defined by the FBiH Government (90% owner of EPBiH) Coal purchase in 2012: 6,232 thousand tons +0,6% compared to 2011
NEW CAPITAL INVESTMENTS IN EPBiH
Background of the opportunity Bosnia and Herzegovina is the country with the highest energy potential in Southeastern Europe: • Bosnia and Herzegovinais a net exporter of electric power • 8.1% of Bosnia’s total exports is related to electric power • Total currently installed and operating capacity - 3.400 MW • Energy production capacities are not fully exploited. • The total estimated hydro potential in BIH is estimated of 23,395 GWh/per year (of whichonly approx. 25% are being utilized) • BIH has significant reserves of coal (3.7 billion tons of lignite and 2.2 billion tons of brown coal)which allow development of new thermalpower plants. • The Government of the Federation of BIH announced a series of projects in the energy sector inthe total value of € 5 billion as a major building block of the economic strategy of the country
Investment environment DRIVERS • Reliable energy supplier in the country and region; • Meet the requirements of EU & increase of generation from renewable energy sources; What will we do? • Uptake new technologies • Significantly reduce CO2 emissions • Increase the efficiency of existing thermal power plants (replacement project) • Diversify the energy portfolio and increase the reliability • Improve distribution network • Jobs creation • Massive investments needed in energy sector • Increasing demand for energy • Volatility in energy prices • Frequent outages • Resource endowment • Technical Capacity Projects are based on Strategic plan and program of development of energy sector in Federation of B&H and Government decisions
List of the planned projects Thermal PP Renewable Energy PP - Hydro • TPP Tuzla, Unit 7 • TPP Kakanj, Unit 8 • TPP Bugojno, Unit 1 • CCGT Kakanj • HPP Vranduk • HPP Janjići • HPP Ustikolina • HPP Čaplje • HPP Kruševo & HPP Zeleni Vir • HPP Kovanići • HPP Vrhpolje • SHPP on Neretvica river • WF Podveležje • WF Vlašić Renewable Energy PP - Wind • WF Podveležje • WF Vlašić
Project description TPP Kakanj - summary Basic project data Total Investment Project development timelines
Project description TPP Kakanj- Heating pipeline Basic project data EPBiH interest • Efficiency increasing of existing and future units • Assure market for heating energy in long term period • Revenue increasing • Meet the requirements of EU • Reducing of emissions Local community interest • Stable heating sistem • Less polution • Energy efficiency • Job creation
Project description HPP Ustikolina • Overview • The HPP «Ustikolina» is located on the Drina river • 4 HPP already exist on river Drina • Connection to agrid is secured. • Positive & Enviromental impacts • Independent energy production source for the region • Waterflow control system improvement • Water supply system improvment • Development of fish farms • Job creation
Project description HPP Ustikolina- summary Total Investment Basic project data Project development timelines
Amil Kamenica – Executive Director for Capital Investment e-mail: am.kamenica@elektroprivreda.ba Elvedin Grabovica - General manager e-mail: e.grabovica@elektroprivreda.ba Edin Mujagic - Executive Director for Economic Affairs e-mail: ed.mujagic@elektroprivreda.ba Tel: +387 33 751 005 Fax: +387 33 751 003