Stay informed about the latest developments in 6GHz technology within ETSI and IEEE, including regulatory timelines, standardization drafts, and harmonized standards. Learn about the progress made in the 6GHz spectrum, adaptivity requirements, and co-existence solutions. Discover the key milestones and upcoming meetings to contribute and participate in shaping the future of 6GHz networks.
E N D
ETSI BRAN Update(IEEE 802.11 Co-Existence Workshop) • David Boldy • Vienna, July 2019
Agenda • Status of 6GHz in Europe • 6GHz work within ETSI • 5GHz update
6 GHz European Regulatory and Standardization Time Line Draft Report A approved by WG FM WI on ECC Decision June SE45 Sharing Study Under Way ECC Report 302 approved May Final Report A Draft Report B March EC Decision ECC Decision EC Mandate 5925-6425 Study FM57 & SE45 created Draft Report A from CEPT to EC July SE45 Sharing Study Complete April Final Report B from CEPT to EC July ECC WI 5925-6425 MHz 2017 2018 2019 2020 2021 + ETSI SRDoc TR 103 524 WI adopted ETSI SRDoc TR 103 524 published WI for a 6 GHz Harmonized EN launched in TC BRAN ETSI 6 GHz Harmonized EN published in OJEU Current date
6GHz Work Within ETSI • ETSI BRAN –Technology Neutral • Systems Reference Document SRDOC TR 103 524 (5925-6725MHz) - published • Technical report TR 103 631 (6725-7125MHz) - published • ETSI MSG TFES - IMT • Technical Report TR 103 612 (6425-7125MHz) – Final draft for approval • ETSI BRAN - Work Item for 6GHz Harmonized Standard
Status of 6GHz in Europe • SE45 • 2019-05-31 - ECC Report 302 approved for publication by WGSE • SE45 kept open until FM57 work is complete • FM57 • 2019-06-06 – WGFM #94 endorsed Draft CEPT Report A • Provided to ECC for Public Consultation • Complementary Studies per Task 2 of EC Mandate (LS to WGSE) • VLP outdoor impact on FS short term interference • CEPT Report B – Timeline July 2020 • WGFM#94 • 2019-06-05 - New WI (FM57_04) adopted to develop ECC Decision on 6GHz RLAN
ETSI EN Approval Process (ENAP) HAS Consultant Approval Oct 2019 BRAN#103 Oct 2019 BRAN#103 Dependent upon ETSI and CEPT timelines CEPT Report B sent to EC (June 2020??) June 2019
Brief History of Adaptivity (Channel Access) • Nov 2011: v1.6.1 “Adaptivity” requirements first introduced replacing the “Medium Access Protocol” requirement • Jan 2015: V1.8.1 Options A and B, plus IEEE Option with test • BRAN#81 – Agreement to replace A/B options with a single option in next RED version v2.1.1. Technology specific reference should not go in the next version. • Work item REN/BRAN-0060015 scope ………... (4) To improve Adaptivity for Load Based Equipment by replacing the current 2 alternative options with a single solution that provides equal (spectrum) access to different technologies. • June 2016: BRAN#88 Coexistence sessions complete in draft v0.0.9 and future input moved to drafting sessions. • Temporary declaration option included for some load based adaptivitytests • March 2017: BRAN#92 Final draft v2.0.11 approved by TC BRAN. Published as RED Version v2.1.1 May 2017 • Next version to consider: • Single ED threshold limit, general review of adaptivity • Guidance of the European Commission to disallow manufacturer declarations to achieve compliance • Latest draft: • Removal of exception to declare compliance instead of testing. • More generic text for ED to allow option conditioned on use of PD, as well as an option for ED only, for all technologies • IEEE 802.11 preamble detection test must be included if using PD
Lessons learned • Agreement is possible even with contentious issues • Meeting schedules often made LS communication inefficient
Status of 5GHz (EN 301 893 v2.2.1) • Outstanding issues for adaptivity as of close of BRAN#102 • Paused COT (Re: NR-U) • No LBT/Short LBT usage • Delayed ACKs and Broadcast Transmissions • Defining Test for IEEE preamble • Expected Final draft approval: BRAN#104 • What can we do better for 6GHz?
Next related BRAN meetings • Relative EDT Levels GoTo Meeting • 1st August 2019, 15:00-18:00 CET • Preamble Detect testing investigation • Hosted by Rohde&Schwarz(Munich): 20th August 2019 • BRAN#103 • 7-10 October 2019 • BRAN#104 • 2-5 December 2019 • Participation / Proposals / Contributions welcome!!