1 / 2

JOINT CLIC/ILC WORKING GROUP REPORT CONVENTIONAL FACILITIES AND SITING

JOINT CLIC/ILC WORKING GROUP REPORT CONVENTIONAL FACILITIES AND SITING V . Kuchler, A. Enomoto, J. Osborne. October 25 Parallel Session 8:30 – 10:30 Reviewed Adjustments Needed for TDR Tables for Americas and Asian Regions Power and Heat Loads 11:00 – 12:30

Download Presentation

JOINT CLIC/ILC WORKING GROUP REPORT CONVENTIONAL FACILITIES AND SITING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JOINT CLIC/ILC WORKING GROUP REPORT CONVENTIONAL FACILITIES AND SITING V. Kuchler, A. Enomoto, J. Osborne

  2. October 25 Parallel Session • 8:30 – 10:30 • Reviewed Adjustments Needed for TDR Tables for Americas and Asian Regions Power and Heat Loads • 11:00 – 12:30 • Potential Near-Surface Americas Region ILC Site • Asian Region Site Investigation Plan in Japan • ILC Territorial Complex North of the Moscow Region • 14:00 – 15:30 • Discussion of Format Consistency for Regional Schematic Drawings to DefineArea Systems • Reviewed Adjustments Needed for TDR Tables for Enclosures and Surface Building Size and Volume • Discussion of Required Updates for Installation Portion of TDR • 16:00 – 17:30 • Closed CFS Discussion Regarding Details for Cost Estimates and Preparation for Upcoming Cost Reviews

More Related