20 likes | 131 Views
JOINT CLIC/ILC WORKING GROUP REPORT CONVENTIONAL FACILITIES AND SITING V . Kuchler, A. Enomoto, J. Osborne. October 25 Parallel Session 8:30 – 10:30 Reviewed Adjustments Needed for TDR Tables for Americas and Asian Regions Power and Heat Loads 11:00 – 12:30
E N D
JOINT CLIC/ILC WORKING GROUP REPORT CONVENTIONAL FACILITIES AND SITING V. Kuchler, A. Enomoto, J. Osborne
October 25 Parallel Session • 8:30 – 10:30 • Reviewed Adjustments Needed for TDR Tables for Americas and Asian Regions Power and Heat Loads • 11:00 – 12:30 • Potential Near-Surface Americas Region ILC Site • Asian Region Site Investigation Plan in Japan • ILC Territorial Complex North of the Moscow Region • 14:00 – 15:30 • Discussion of Format Consistency for Regional Schematic Drawings to DefineArea Systems • Reviewed Adjustments Needed for TDR Tables for Enclosures and Surface Building Size and Volume • Discussion of Required Updates for Installation Portion of TDR • 16:00 – 17:30 • Closed CFS Discussion Regarding Details for Cost Estimates and Preparation for Upcoming Cost Reviews