1 / 18

TNO B&O Geological Survey of the Netherlands

DINO DEEP: Plans for 2009 User council 20081008. TNO B&O Geological Survey of the Netherlands. This short presentation. Assignment Progress in 2008 Plans for 2009. Assignment DINO DEEP three aspects. Give users easy access to the Mining Act data

joanna
Download Presentation

TNO B&O Geological Survey of the Netherlands

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DINO DEEP: Plans for 2009 User council 20081008 TNO B&OGeological Survey of the Netherlands

  2. This short presentation • Assignment • Progress in 2008 • Plans for 2009

  3. Assignment DINO DEEPthree aspects • Give users easy access to the Mining Act data • Make the data and information produced in the Geo-Information Program publicly available • Support the partners in the Geological Survey of the Netherlands, i.e. Advisory Group EA and the mapping of the deep subsurface

  4. Easy access to the Mining Act data • Why? To stimulate exploration in the Netherlands (> policy letter 2004) • How? since 2007 in co-operation with the big 4 • Priorities • Basic bore-hole data • Scanned logs • Directional surveysCore analysesLIS- and LAS-files • Reports and research bore-hole data

  5. Progress 2008Easy access to the Mining Act data • Development of DINO-LOGS (LIS and LAS) • Log scanning project • Development of DINO-CSM (cores and cuttings) • More seismic datatypes in DINO-SMC

  6. LOGS Easy access to the Mining Act data DINO-LOGS in 2008 • In production for internal use since September • High-end confidentiality concept is to be implemented (November) • Conversion of the 20-40.000 files is the main target (October-November) • Next step is to link the files to the proper bore-hole (November – 2009) • First files available at NLOG (December)

  7. AST Easy access to the Mining Act data Log scanning project in 2008 • Per ultimo 2008 54,000 logs as separate files available at NLOG • Remaining NAM logs (>SLIDE-project) zipped and linked to primary bore-holes available at NLOG • Winterhall images processed • NAM images processed, partially unzipped • Scanning of Gaz de France, Total, EBN logs in progress • TNO archives: small part of NAM logs to be scanned

  8. Easy access to the Mining Act data DINO-CSM in 2008 CSM • Data has been converted • Application will be in production in November

  9. SMC Easy access to the Mining Act data Seismic data in 2008 • Metadata of analogous 2D seismic lines converted (end of October) • SEGY from vectorisation of images

  10. Progress 2008GIP data & information & Support GSN • DINO-MAP (maps as tiffs and datafiles) in production • New release of DINO-RES (reserves, accumulations): in production November • DINO-LIC (licences) in use

  11. Plans for 2009 General • Business as usual • Improving the architecture of the DINO system • Improving the datamodel for all sample related data

  12. Easy access to the Mining Act dataCo-operation with the big 4 Expected status per ultimo 2008 • Basic bore-hole data: fine tuning • Scanned logs: in progress • Directional surveys: started Core analyses started LIS- and LAS-files start in 2009 • Reports and research data waiting

  13. AST Plans for 2009 Easy access to the Mining Act data • Completion of the Log scanning project • Modest start with scanning of reports from the TNO Archive • Implementation of high-end confidentiality • Start to monitor Mining Act data supply (workflow management)

  14. BRH Plans for 2009 Easy access to the Mining Act data • Processing of the directional surveys provided by the big 4 • Processing of the (conventional) core analysis data provided by the big 4

  15. RES Plans for 2009 Easy access to the Mining Act data • Processing of workovers and quality control of well data • Implementation of QC-rules for production figures in DINO

  16. LOGS Plans for 2009 Easy access to the Mining Act data • Linking of converted files to the proper bore-hole completed • Starting the processing of LIS & LAS provided by the big 4 • Extraction of (p, T) data from the files

  17. Plans for 2009 GIP data & information & Support GSN • Development of DINO P&T • Maintenance of DINO-RES • Production of facies interpretations • Production of composite well logs • Scanning of the Coal Mine Archives (continued)

  18. Questions?

More Related