1 / 6

ProActive User Group Grid Plugtests

ProActive User Group Grid Plugtests. 2004, 2005, 2006. A successful event!. Melbourne Nancy Metz Napoli. Amsterdam Belfast Fribourg Grenoble Lille. Manchester Melbourne Merida Metz Bombay. Nancy Napoli Nice Metz Paris. Pise Rennes Santiago San Diego.

joey
Download Presentation

ProActive User Group Grid Plugtests

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ProActive User GroupGrid Plugtests • 2004, 2005, 2006 A successful event! Denis Caromel

  2. Melbourne Nancy Metz Napoli Amsterdam Belfast Fribourg Grenoble Lille Manchester Melbourne Merida Metz Bombay Nancy Napoli Nice Metz Paris Pise Rennes Santiago San Diego Denis Caromel

  3. ProActive Grid Plugtests, 04, 05, 06 • Between 20 to 40 sites around the world: • 2006: 4130 cores • Total power: ~ 1700 GFlops (100 Giga Flops in 04) • Highly heterogeneous : • Machines: IBM, SGI, Sun, Bull, Mac • OS: Linux, Windows, Solaris, MacOS, SGI Irix • JVMs: Sun, SGI, BEA • Protocols: ssh, rsh, sshGSI, Globus Gram • Job Schedulers: PBS, LSF, Grid Engine, Oar, Prun, Globus Denis Caromel

  4. Mario Leyton U. Chile N-Queens Challenge : Results Antonio Cansado PUC Chile • 1st PRIZE: 1 laptop • Maximum number of solutions computed in 1 hour • UCHILE • 18, 2x19, 4x20 and 2x21 800 billions solutions • Deployed 560 Workers in parallel • Counted 21 Queens 24’38’’ • Counted 20 Queens 7’25’’ • Counted 19 Queens 4’10’’ • 2nd PRIZE: 1 PDA • Maximum number of nodes deployed in one successful computation • AlgoBAR • Deployed 216 Workers • 3rd PRIZE: 1 PDA • Fastest computation (elapsed time) • INRIA+NTU • 21 Queens in 44’00 • 20 Queens in 19’14 Luis Mateu U. Chile Denis Caromel

  5. 2006 Winners :Eight Samurai - University of Tokyo– JAPAN Denis Caromel

  6. The Grid Guru Denis Caromel

More Related