An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Bituminous Stabilized Materials Guideline Project Initiated By: Gautrans Sabita

    2. The Need for Recycling Alternatives

    3. Current Guidelines: Main Deficiencies Mix Design Lack of a suitable curing method Lack of a suitable Shear Strength test Lack of criteria to assess durability & flexibility Structural Design Very Conservative designs Need to expand knowledge base and incorporate long term field data

    4. Project Structure

    5. Tasks for Phase 2 Mix Design Adapt triaxial test and classification limits Develop durability test and classification limits Standardize specimen preparation, curing, compaction & testing Structural Design Expand LTPP database Develop and calibrate material classification method and pavement design method

    8. Structural Design Method Depend on Rational Inputs: Determined from field tests using a specific procedure Direct linkage with specifications Clarity and Transparency Traceable validation Implements design fundamentals Straightforward Implementation Requires no specialist software Reliable and Robust

    9. Design Outputs & Expectations

    10. Development Approach

    12. Conclusion Structural Design: Concept finalized March 2007 Pilot implementation & refinement Mar ’07 to Jan ‘08 Mix Design Protocols (2007) Focus on Shear & Durability Improved criteria and classification limits Longer term testing and implementation of new tests…(2008+)