An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2011 INFRARED OPERATIONS REVIEW Providing Safe and Efficient IR Reconnaissance.

  2. 2011 INFRARED OPERATIONS April to October

  3. FIRST FIRE FLOWN: Crystal Fire Colorado; April 07

  4. LAST FIRE FLOWN: Ferris Mountain Fire Wyoming; Oct 04

  5. 2011 IR TRIVIA: • Number of Different States Flown in 1 Night: 4 • Number of Different Fires/Complexes Flown in 1 Night: 7 • Largest Fire in AZ History Wallo Fire 538,049 Acres • Longest Duration Flight 8 hours Ogden to California • Most Northern IR Operation: Washington • Most Southern IR Operation: Texas • States / Provinces Flown During 2011 Fire Season: • AZ, CA, CO, ID, MT, NM, OR, TX, UT, WA, WY, Mexico • Total Combined Flight Hours – 785 • Approaching a Normal Fire Season

  6. 2011 Percentages of IR filled 44z & 49z:Total Number 672

  7. 2006 - 11 & Comparison filled:Total Number 2011 (672) (68)

  8. 2006 - 11 & Comparison Percentage filled:

  9. 2011 ORDERS:Distribution per Aircraft

  10. N149Z 2008 STATISTICS N149Z 2011 STATISTICS

  11. N149Z:Hours Flown – 378Total Aircraft Operating Cost - $393,120.00 Aircraft Hourly Flight Rate 2011: $1040.00 Aircraft Hourly Flight Rate 2012 Projected: $930.00

  12. Automated Flight Following History 49z April to October

  13. N149Z: • March 21, April 11, Phase 2 New Exhausts • April 30, Scanner Install • May 01, Dispatch to Midland TX • May 02-04, Down for Maintenance Cracked Window TX • 3 fires UTF resulting from Downed aircraft • May 20, RTB Ogden A/C repair • July 06-14, Maintenance Phase Hobbs time between phase for BE200 200 hours.

  14. N149Z: • August 21-22, Left Fuel Aux transfer switch • September 26, Phase Maintenance • Flew to within 1.1 hours of phase • Scanner Removal October 28, • Grid Flight Check Boise • Prop Overall due October 31, • Aircraft projected down for 12-14 days in October • Time Remaining till next phase 185.3 Hobbs time between phase for BE200 200 hours.

  15. N144Z 2011 STATISTICS

  16. N144Z:Hours Flown – 321Total Aircraft Operating Cost - $539,280.00 Aircraft Hourly Flight Rate 2011: $1680.00 Aircraft Hourly Flight Rate 2012 Projected: $1740.00

  17. Automated Flight Following History 44zApril to October

  18. N144Z: • March 31, Scanner Install • Phoenix Calibration check flight BOI • March 31, ATG 5000 install • April 29, Bird Strike • 2 UTF’s incurred on 05/01/2011 • Reposition FAA Ferry Permit MAF to SAT 05/02/2011 • Maintenance Phase 3 & 4 completed early while at SAT • Returned to Service 05/19/2011 • May 31 – Bore Scope Inspection, • Return to Service 06/02/2011 • Inspection extended Engine Use for 100 hours Hobbs time between phase for C550 150 hours.

  19. This is What a Bird Strike Looks Like

  20. The Repair

  21. N144Z: • Scanner Computer Virus • July 01 flew to Boise for repairs 3 UTF’s incurred 06/30 • July 02, Generator Problem • UTF’s 1 fire • July 26, – Fuel Leak • Return to Service 07/29/2011 • September 19, Maintenance Phase I & II • Return to Service 09/21/2011 • Time Remaining until next inspection 11.8 Hobbs time between phase for C550 150 hours.

  22. N144Z: • Scanner Removal October 9 or 10 • Grid flight check Boise • January 2012, Engine Replacement Hobbs time between phase for C550 150 hours.

  23. Infrared Pilot Staff 2011

  24. REVIEW ITEMS • Staffing: • Pilot Staff • 2012 Hiring / Contract • Pilot Schedule • http://fsweb.r4.fs.fed.us/unit/faa/aviation.htm • IR Operations: • Canada • NAFTA operating certificate approved 2011 • Sensor Grid Boise • Planned flight October / November 2011

  25. REVIEW ITEMS • IR Operations / Suggestions: • NIROPS Web Page & Ordering • Delivery Time (Define) with a pull down MDT/PDT etc. • NICC confirmation the request approved field NICC only accessible. • Additional Nirops menu where information can be entered addressing Potential fires or information that may effect crews • Complete baseline scanner testing on: • Proposed 2012 dates • Possibly keep one aircraft with a scanner in it all year long or installing 1 unit much earlier than normal ….. say Feb? • Could Texas order IR Early

  26. REVIEW ITEMS • Nirops Guide Update: • Operational • Review Update for 2012

  27. Any Questions?