Outline:. XPC Status report VETO status report Glass RPC R&D. XPC Planes. XPC1 prototype realized and tested (october 2003) XPC mechanical structure: final firm choice (27-3-2004) (INFN approval still in progress) Mounting (structure): XPC1/2 SM1 september 2004 (20 d)
E N D
Outline: • XPC Status report • VETO status report • Glass RPC R&D
XPC Planes XPC1 prototype realized and tested (october 2003) XPC mechanical structure: final firm choice (27-3-2004) (INFN approval still in progress) Mounting (structure): XPC1/2 SM1 september 2004 (20 d) XPC2-SM2 may 2005 (7 d) XPC1-SM2 june 2005 (10 d) RPC commissioned Strip commissioned Interconnecting card designed and commissioned Mounting (RPC+strips): Details of layout under study Tendering for RPC mounting in progress
VETO system VETO mechanical structure: final firm choice (may 2004) (INFN approval still in progress) Mounting (structure): februray 2005 or begin of 2006 Large Glass RPC under test Details of final layout under study
A B C A: Poor covering, no fake events from the iron structure, interference with the BMS mounting*, interference with BMS operation? B: good covering, fake events from the pillars no BMS interference. C: good covering, no fake events from the pillars, interference with the BMS mounting*, interference with BMS operation? *No interference if the mounting is in 2006.
moveable structure for RPC mounting with footbridge A 110 mm shift is mandatory for mounting with the footbridge…
The 128 glass RPC’s of the Trigger walls of the LNGS test facility represent a real test scale (20% of VETO surface, 80% of equivalent underground life)
Radiation damaging test (~100 years of OPERA operation) has been performed at the Gamma Irradiation Facility @ CERN By using a 137Cs source
Water vapor aging test: after the water damaging a full recovering of the efficiency has been achieved by ammonia flushing,
Glass RPC: technical details New coating (about 300 kW) glue glass New frame Concave profile to prevent discharges
Gap uniformity Glass RPC: technical details 10 cm spacing leads to 253 buttons 20 cm spacing leads to 60 buttons 25 cm spacing leads to 24 buttons!! less manpower, higher efficiency Constraint: tolerance < 20 microns
General Tecnica G&A ICRA
General Tecnica • 3 mm electrodes • 1m x 0.50m day1 day2 day3 Day9 Efficiency after 2 days Efficienza after 9 days
ICRA • 3 mm electrodes • 0.60m x 0.60m day1 day2 day3 day4 day1
GT Icra ICRA VS GT Rivelatore GT ICRA GT ICRA
2600 mm 1136 mm 200 mm