80 likes | 777 Views
Status: Draft . Target. The task groups (API and ISO) have an ambition of submitting an issue (DIS) for comments within end of 2009. (Status medio 2009) The task has been more comprehensive than first anticipated. The ambition now is to finalise the technical content within October 2010. (Status
E N D
1. Status: Draft Status report for revision of ISO 13628-6 (API 17F) Winter meeting Houston January 2011
2. Status: Draft Target The task groups (API and ISO) have an ambition of submitting an issue (DIS) for comments within end of 2009. (Status medio 2009)
The task has been more comprehensive than first anticipated. The ambition now is to finalise the technical content within October 2010. (Status medio 2010)
Technical content will be finalised primo 2011
3. Status: Draft Table of content to be as existing standard System requirements
Surface equipment
Subsea equipment
Interfaces
Materials and fabrication
Quality
Testing
Marking, packaging, storage and shipping
4. Status: Draft Modifications General revision of text in document
Pressure definitions improved/clarified
Software development requirements included
Subsea processing covered
Horizontal integration covered
Statement related to SIL included
Cleanliness requirements revised
Annex C updated
Annex E revised
Annex F revised
Annex G revised
Annex H revised
EMC requirements will be revised
5. Status: Draft ISO task group meetings Kick off meeting in Oslo Norway October 2008
Celle Germany February 2009
Copenhagen Denmark June 2009
London UK October 2009
Asker Norway February 2010
Bristol UK May 2010
Aberdeen UK September 2010
Oslo Norway January 2011 (Review of API comments)
6. Status: Draft API working group meetings January 2009
June 2009
January 2010
May 2010
November 2010
Joint API / ISO meeting in Houston January 2011
7. Status: Draft ISO task group participants Project leader Roald Loug Hansen, StatoilHydro, Norway, roloha@statoilhydro.com
Members
Paul Thomas, Aker Solutions, UK, paul.thomas@akersolutions.com
Bruce Scott, Halliburton, , Bruce.Scott@Halliburton.com
Cristopher Curran, BP, USA, Christopher.Curran@bp.com
Frederico Nicoletti, Subsea 7, Brazil, frederico.nicoletti@subsea7.com
Gerhard Wilche, Cameron, Germany, gerhard.wilcke@c-a-m.com
Ian Kent, GE, UK, ian.kent@ge.com
Jesper Jacobsen, Dong Energy, Denmark, jesja2@dongenergy.com
John Bodine, Chevron, USA, john.bodine@chevron.com
Ken Ellis, SES, , ken.ellis@subseaengineeringsolutions.com
Mike Theobald, Maersk Oil, Denmark, Mike.Theobald@uk.bp.com
Stefan Knepper, Cameron, Germany, stefan.knepper@c-a-m.com
Svein Lilleland, FMC, Norway, Svein.Lilleland@fks.fmcti.com
Sverre Corneliussen, FMC, Norway, Sverre.Corneliussen@fks.fmcti.com
Trond Bertmand, StatoilHydro, Norway, trbert@statoilhydro.com
Werner Menz, Cameron, Germany, menzw@camerondiv.com
David Saul, BP, UK,
Jens-Henrik Neuenkirchen, StatoilHydro, Norway, jhn@statoilhydro.com
8. Status: Draft API 17F working group Christopher Curran, BP
Brian Skeels, FMC
David Lansbury, FMC
Jay Hursh, Aker Solutions
John Allen, GE Vetco
John Simon, Shell
Mike Brashear, Chevron
Lee Mitchell, Chevron
Richard Barratt, GE Vetco
Don Schlater, BP
Jim Metzinger, Technip Butch Taggart, Murphy
Al Williams, Dril-Quip
Don Ogwude, CSI
Jose D Baca ExxonMobil
Lon Ngo, Dril-Quip
Mark Marsalis, Dril-Quip
Ryan Chladek, ExxonMobil