1 / 9

Business Aspect of Change

Business Aspect of Change. Cynthia Allen. Your Worldwide Logistics Partner. Documents Required Process. New Mind Set by Brokers Managing Different Reports Daily Statement now serves several purposes Docs Required Payment Checks and Balances Internally

Download Presentation

Business Aspect of Change

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Business Aspect of Change Cynthia Allen Your Worldwide Logistics Partner

  2. Documents Required Process • New Mind Set by Brokers • Managing Different Reports • Daily Statement now serves several purposes • Docs Required • Payment • Checks and Balances Internally • Other reports that are ACE Portal Based • Internal Comparison Difficult • ABI Requests Messages • Affect Recordkeeping • Equipment Requirements • Imaging / Scanning Ability • Electronic Storage Abilities • System Needs • How will these imaged documents tie into your transmission files? • Training Needs • Fundamental change in flow of entries Argents Air Express, Ltd

  3. Post Summary Correction • One Transmission of the Entry Summary • Analysis of Current Retransmissions • One Step vs. Two Step • Client Visibility via ACE Portal • System Edit, Checks, Stops • Visibility to CBP • Reason Codes • Successive Changes • Importer or Broker Issues • Compliance Measurements Results • Corrective Process • Electronic vs. Manual Process • Recordkeeping Issues – Keeping all versions • Denial by CBP – Affect on Funds Paid • Approval - Refunds of Funds Paid • Training Needs • Employees • Clients • System / Equipment Needs • Additional capabilities • Tracking / Flagging abilities Argents Air Express, Ltd

  4. Line Item Level Detail • Reconciliation Flagging • ADD Lines Isolated • Line Level Consignees • Documentation Quality • Information from all parties • EDI Interface changes • Communication with Other Parties Filing Data • Effect of Targeting Results • Will this increase / change exams requirements • Census Override • Systems Requirements • Expanded Fields • Client Education Required • Employee Training Argents Air Express, Ltd

  5. Deployment Schedule • Two Sets of Systems, Two Sets of Process, Two Sets of Headaches • System Determined or Manual Process? • Changes After the Fact? • 01 Type Entry Changing to 03 Type Entry • Training Employees for the Overlap • Importer Awareness of the two Systems • Information in ACE Portal • Abilities between the two system • Inconsistencies Between the Two Systems Argents Air Express, Ltd

  6. EDIT LITE • www.acetransition.net • Increase in Liability • Instead of up front edit checks – this becomes a post entry audit function for CBP • Broker Internal Review Process • One Entry Summary Transmission • One Step vs. Two Step Process • New Legislation Becomes More Complicated • One CBP Interpretation Becomes Many • Software Providers, CBP Port Offices, Brokers • Lack of Edits Will Become More Pronounced • Identification of Errors – Longer to Identify • Software Becomes Critical • Training for Employees • Technical or CATAIR Understanding by Operational Staff • Process Understanding by IT • Costs Are Going to Increase Argents Air Express, Ltd

  7. Interaction • With Clients • Data on ACE Portals • Additional Contact With CBP Directly • With Other Parties – ACE Accounts • Surety Companies • Carriers • Transportation Firms • Warehouse / CFS Locations • With CBP • Much More Comprehensive Picture • Brokers • Importers Argents Air Express, Ltd

  8. Problem Contingency Plans • Work with CBP on Local and National level to develop plans • Once developed share those plans with other NCBFAA member associations • Develop plans internally • Get your IT and Operations people at the same table • Go through the release scope • Develop actions from each perspective • Communication, Communication, Communication, Communication Argents Air Express, Ltd

  9. Business Aspect of Change • This is much more than a system change • We need to look at • Internal Processes • Employee Training • System and Equipment Need • Client Interaction and Education Argents Air Express, Ltd

More Related