PENGANTAR INSTALASI RADIOMETALURGI (IRM)

PENGANTAR INSTALASI RADIOMETALURGI (IRM). Nur Syamsi Syam , ST, M.Eng . Basic Professional Training Course - BAPETEN Cisarua , 26 Maret 2014. BIODATA. Nama : Nur Syamsi Syam , ST., M.Eng Tempat / Tgl Lahir : Sinjai , 16 September 1980

Download Presentation

PENGANTAR INSTALASI RADIOMETALURGI (IRM)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PENGANTAR INSTALASI RADIOMETALURGI (IRM) NurSyamsiSyam, ST, M.Eng. Basic Professional Training Course - BAPETEN Cisarua, 26 Maret 2014

  2. BIODATA Nama : NurSyamsiSyam, ST.,M.Eng Tempat /TglLahir : Sinjai, 16 September 1980 Unit Kerja : Perizinan INNR, DPIBN (2005 – sekarang) Jabatan : PengawasRadiasiMuda e-mail : n.syam@bapeten.go.id Pendidikan : 1. S1 TeknikNuklir, UniversitasGadjahMada, Yogyakarta, 2003 2. S2 Magister SistemTeknologiEnergi, UGM, 2010 Training Bidang InstalasiNuklir • Pelatihan Instalasi Nuklir Nonreaktor-BAPETEN, 2007 • OJT on Human Induced Event Aspect of NPP siting, US-NRC, USA, 2012 • Safety of Nuclear Fuel Cycle Facility – IRSN, Perancis, 2013 • MEXT Research Program, NPP Dismantling Technology, 2013

  3. PENDAHULUAN

  4. TUJUAN PEMBELAJARAN

  5. Pendahuluan • RiwayatInstalasi POKOK BAHASAN • DeskripsiInstalasi • SistemOperasidanSistem Bantu IRM • AspekKeselamatan • Penutup

  6. RIWAYAT INSTALASI • Bagiandariresearch and development facilities for nuclear fuel • Dirancang untuk kegiatan pengujian dan pengembangan uji pasca iradiasi (PIE) elemen bakar (MTR, PWR, PHWR) dankomponenreaktorlainnya • Desainhotcell: GCNF (German Consortium) • Komisioning (1992 – 1993) olehpersonil IRM didampingioleh GCNF, TrubaJurong (M&E) danWaskitaKarya (sipil) • Komisioningmenggunakan MTR fuel type (fresh danpascairadiasi R-19) • Dioperasikanoleh PTBBN – BATAN dengan I.O. No. 473/IO/Ka-BAPETEN/29-XI/2011 (MB 10 tahun)

  7. NUCLEAR FUEL R & D

  8. INSTALASI DAUR BAHAN BAKAR NUKLIR IRM

  9. DESKRIPSI INSTALASI • FungsidanKegiatan IRM • Sistemoperasidanproses • Sistem bantu • Sistemkeselamatan

  10. FUNGSI DAN KEGIATAN IRM • menangani sumber radiasiaktivitastinggiberupabahanpascairadiasiseperti BBNB dan bahan target iradiasi. • Kegiatan yang telahdilaksanakan: • 1993 – 2006: - Rest of U3O8-Al (RI-19) - PIE U3O8-Al (RI E-01) dan U3Si2-Al (RI SIE-02) - PT Batek - LEU foil target, produksi Mo-99 (with the ANL-USA) - Pengembangan BB Silisidatingkatmuattinggi • Kegiatan yang direncanakan: • Pembuatan standar acuan untuk bahan bakar nuklirUxSiy. • Pengambilan Thorium dariMonasit (maksimum 500 gram Thorium) • UjisifatmekanikdenganUjitarikspesimen mini.

  11. PROSES KIMIA

  12. ALUR PROSES PIE ZG 101 (sel Penerima) ZG-103(pengu- jian tak merusak) ZG-104 (uji Merusak: metalo Rafidan preparasi sampel) ZG 102(peme- riksaan visual Dan pembong- karan) ZG 110-112 (uji mekanik) ZG 107 (mikroskop Optik) ZG 108 dan 109 (uji Kimia-fisik)

  13. Penerimaan BBNB di ZG101

  14. SISTEM OPERASI DAN PROSES (HOTCELL) • Concrete Cell (ZG 101, ZG 102, ZG 103) - Tebal 1,2 m; 2 jendela; 2 pasang manipulator • ZG101 : Penerima, terhubungke ISSF • ZG102 : Pembongkaran, terhubungke 001 (limbah) • ZG103 : UjiTakMerusak • Kapasitas: 6 bundel MTR atau 1 batang PWR/BWR atau 1 bundel PHWR (CANDU) • Concrete cell 001 tanpa manipulator: Penangananlimbah

  15. Concrete Cell (001)Limbah Concrete Cell (101)

  16. SISTEM OPERASI DAN PROSES (HOTCELL) • ZG-104 s/d ZG-106: • Preparasispesimen, MikroskopOptikdan storage • ZG-107: MikroskopOptik & Mikro hardness • ZG 108 dan ZG 109: Radiokimia • ZG 110 dan ZG 111: Ujisifat-sifatmekanik • ZG 112: Preparasispesimen SEM/TEM & gamma auto-radiography

  17. SISTEM OPERASI DAN PROSES (HOTCELL) • ZG-104 s/d ZG-107: • elemen bakar PWR/BWR, panjang sampel, 50 mm • pelat elemen bakar MTR, panjang sampel, 33 mm • ZG-108 s/d ZG-112: • elemen bakar PWR/BWR, panjang sampel 22 mm • p.e.b MTR 30, panjang sampel 10 mm • e.b tipe CANDU, panjang sampel 14,5 mm

  18. Steel Cell

  19. DimensiHotcell IRM

  20. Layout IRM OPERATING AREA Hatch to service area 101 102 103 ENTRANCE HALL 104 Hatch to basement 105 TEM ROOM Conveyor line-2 SERVICE AREA 106 108 109 110 111 112 107 Conveyor line-1 SEM ROOM Glove box OPERATING AREA Rabbit System to Glove Boxes

  21. KELOMPOK PERALATAN PROSES • Peralatan Transfer/penanganan: • manipulator, power manipulator, incell crane, konveyor, roller conveyor dll • PeralatanUji (didalamdandiluar hot cell) • Ujimetalografi, radiokimia, dll • Peralatanpenyimpanan • rak, drum, can bertimbal dan lainnya.

  22. LABORATORIUM UJI • Selainperalatanujidalamhotcell, IRM memiliki: • Laboratoriumkeaktifansedang • R135  fumehooddanglovebox • Laboratoriumkeaktifanrendah • R136, R127, R132, R133, R134, R171, R139, R142, R220, R206, R212 • Berbagaiperalatanuji, glovebox, fumehood

  23. SISTEM BANTU (1) • Sistemcatudayalistrik • Normal (PLN), darurat (Genset), UPS (rusak, menggunakanlampudarurat) • Sistemventilasi (VAC) • Subsistemudaramasuk • intake grill & filter, supply fan, koilpendingin • Subsistemudarabuang • dua lapis filter HEPA, exhaust fan, dancerobong • Subsistem air dingin • chiller, pompasirkulasi, koilpendingindantangkiekspansi • Subsistemtataudaraperkantoran, • AHU, FCU (Fan Coil Unit), pompa booster, dan fan AHU

  24. Simplified VAC air flow

  25. SISTEM BANTU (2) • SistemPemasok Air • Air domestik (proses, pendingin, sanitasi) • Air pendinginlaboratorium • SistemUdaraTekan • proses (service area, beberapa lab., dansemuahotcell, ruang exhaust, ruangujimekanik, danruang supply air) • Instrumentasi (pneumatic damper, instrumenpada • Dihasilkandari 3 kompressorutamadan 1darurat • Sistemkomunikasi

  26. ASPEK KESELAMATAN INNR Kejadian abnormal dapatterjadikarena : • Kegagalanfungsialat • Kesalahanmanusia • Penyimpanganprosedur Contohkejadian abnormal : kegagalanventilasikarenakegagalansistem chiller atau blower dankondisi filter yang jenuh JenisKecelakaandi INNR : • Kekritisan • Bebanmekanis • Kebakaran • Ledakan

  27. HasilAnalisisBahaya IRM Kekritisandicegahdenganmengaturjarakpadarakpenyimpanan Kecelakaanterparah: Jatuhnya BB nuklir

  28. SOURCE TERM 6 BUNDLE MTR

  29. SSK KESELAMATAN • Hotcell, perisaipadahotcell • Rakpenyimpanbahanbakardanwadahpengungkung ZRA lainnya • Sistemventilasi

  30. PENUTUP • Sistem-sistemdi IRM: • Sistemoperasidanproses • Sistem Bantu • SistemKeselamatan • KegiatanUtama IRM: pengujianpascairadiasidalamhotcelldanpengembangandibidangteknologibahanbakarlainnya • Aspekkeselamatan IRM: • SSK Keselamatan • Analisisbahaya • Analisiskecelakaan