PENGANTAR INSTALASI RADIOMETALURGI (IRM). Nur Syamsi Syam , ST, M.Eng . Basic Professional Training Course - BAPETEN Cisarua , 26 Maret 2014. BIODATA. Nama : Nur Syamsi Syam , ST., M.Eng Tempat / Tgl Lahir : Sinjai , 16 September 1980
E N D
PENGANTAR INSTALASI RADIOMETALURGI (IRM) NurSyamsiSyam, ST, M.Eng. Basic Professional Training Course - BAPETEN Cisarua, 26 Maret 2014
BIODATA Nama : NurSyamsiSyam, ST.,M.Eng Tempat /TglLahir : Sinjai, 16 September 1980 Unit Kerja : Perizinan INNR, DPIBN (2005 – sekarang) Jabatan : PengawasRadiasiMuda e-mail : n.syam@bapeten.go.id Pendidikan : 1. S1 TeknikNuklir, UniversitasGadjahMada, Yogyakarta, 2003 2. S2 Magister SistemTeknologiEnergi, UGM, 2010 Training Bidang InstalasiNuklir • Pelatihan Instalasi Nuklir Nonreaktor-BAPETEN, 2007 • OJT on Human Induced Event Aspect of NPP siting, US-NRC, USA, 2012 • Safety of Nuclear Fuel Cycle Facility – IRSN, Perancis, 2013 • MEXT Research Program, NPP Dismantling Technology, 2013
Pendahuluan • RiwayatInstalasi POKOK BAHASAN • DeskripsiInstalasi • SistemOperasidanSistem Bantu IRM • AspekKeselamatan • Penutup
RIWAYAT INSTALASI • Bagiandariresearch and development facilities for nuclear fuel • Dirancang untuk kegiatan pengujian dan pengembangan uji pasca iradiasi (PIE) elemen bakar (MTR, PWR, PHWR) dankomponenreaktorlainnya • Desainhotcell: GCNF (German Consortium) • Komisioning (1992 – 1993) olehpersonil IRM didampingioleh GCNF, TrubaJurong (M&E) danWaskitaKarya (sipil) • Komisioningmenggunakan MTR fuel type (fresh danpascairadiasi R-19) • Dioperasikanoleh PTBBN – BATAN dengan I.O. No. 473/IO/Ka-BAPETEN/29-XI/2011 (MB 10 tahun)
DESKRIPSI INSTALASI • FungsidanKegiatan IRM • Sistemoperasidanproses • Sistem bantu • Sistemkeselamatan
FUNGSI DAN KEGIATAN IRM • menangani sumber radiasiaktivitastinggiberupabahanpascairadiasiseperti BBNB dan bahan target iradiasi. • Kegiatan yang telahdilaksanakan: • 1993 – 2006: - Rest of U3O8-Al (RI-19) - PIE U3O8-Al (RI E-01) dan U3Si2-Al (RI SIE-02) - PT Batek - LEU foil target, produksi Mo-99 (with the ANL-USA) - Pengembangan BB Silisidatingkatmuattinggi • Kegiatan yang direncanakan: • Pembuatan standar acuan untuk bahan bakar nuklirUxSiy. • Pengambilan Thorium dariMonasit (maksimum 500 gram Thorium) • UjisifatmekanikdenganUjitarikspesimen mini.
ALUR PROSES PIE ZG 101 (sel Penerima) ZG-103(pengu- jian tak merusak) ZG-104 (uji Merusak: metalo Rafidan preparasi sampel) ZG 102(peme- riksaan visual Dan pembong- karan) ZG 110-112 (uji mekanik) ZG 107 (mikroskop Optik) ZG 108 dan 109 (uji Kimia-fisik)
SISTEM OPERASI DAN PROSES (HOTCELL) • Concrete Cell (ZG 101, ZG 102, ZG 103) - Tebal 1,2 m; 2 jendela; 2 pasang manipulator • ZG101 : Penerima, terhubungke ISSF • ZG102 : Pembongkaran, terhubungke 001 (limbah) • ZG103 : UjiTakMerusak • Kapasitas: 6 bundel MTR atau 1 batang PWR/BWR atau 1 bundel PHWR (CANDU) • Concrete cell 001 tanpa manipulator: Penangananlimbah
Concrete Cell (001)Limbah Concrete Cell (101)
SISTEM OPERASI DAN PROSES (HOTCELL) • ZG-104 s/d ZG-106: • Preparasispesimen, MikroskopOptikdan storage • ZG-107: MikroskopOptik & Mikro hardness • ZG 108 dan ZG 109: Radiokimia • ZG 110 dan ZG 111: Ujisifat-sifatmekanik • ZG 112: Preparasispesimen SEM/TEM & gamma auto-radiography
SISTEM OPERASI DAN PROSES (HOTCELL) • ZG-104 s/d ZG-107: • elemen bakar PWR/BWR, panjang sampel, 50 mm • pelat elemen bakar MTR, panjang sampel, 33 mm • ZG-108 s/d ZG-112: • elemen bakar PWR/BWR, panjang sampel 22 mm • p.e.b MTR 30, panjang sampel 10 mm • e.b tipe CANDU, panjang sampel 14,5 mm
Layout IRM OPERATING AREA Hatch to service area 101 102 103 ENTRANCE HALL 104 Hatch to basement 105 TEM ROOM Conveyor line-2 SERVICE AREA 106 108 109 110 111 112 107 Conveyor line-1 SEM ROOM Glove box OPERATING AREA Rabbit System to Glove Boxes
KELOMPOK PERALATAN PROSES • Peralatan Transfer/penanganan: • manipulator, power manipulator, incell crane, konveyor, roller conveyor dll • PeralatanUji (didalamdandiluar hot cell) • Ujimetalografi, radiokimia, dll • Peralatanpenyimpanan • rak, drum, can bertimbal dan lainnya.
LABORATORIUM UJI • Selainperalatanujidalamhotcell, IRM memiliki: • Laboratoriumkeaktifansedang • R135 fumehooddanglovebox • Laboratoriumkeaktifanrendah • R136, R127, R132, R133, R134, R171, R139, R142, R220, R206, R212 • Berbagaiperalatanuji, glovebox, fumehood
SISTEM BANTU (1) • Sistemcatudayalistrik • Normal (PLN), darurat (Genset), UPS (rusak, menggunakanlampudarurat) • Sistemventilasi (VAC) • Subsistemudaramasuk • intake grill & filter, supply fan, koilpendingin • Subsistemudarabuang • dua lapis filter HEPA, exhaust fan, dancerobong • Subsistem air dingin • chiller, pompasirkulasi, koilpendingindantangkiekspansi • Subsistemtataudaraperkantoran, • AHU, FCU (Fan Coil Unit), pompa booster, dan fan AHU
SISTEM BANTU (2) • SistemPemasok Air • Air domestik (proses, pendingin, sanitasi) • Air pendinginlaboratorium • SistemUdaraTekan • proses (service area, beberapa lab., dansemuahotcell, ruang exhaust, ruangujimekanik, danruang supply air) • Instrumentasi (pneumatic damper, instrumenpada • Dihasilkandari 3 kompressorutamadan 1darurat • Sistemkomunikasi
ASPEK KESELAMATAN INNR Kejadian abnormal dapatterjadikarena : • Kegagalanfungsialat • Kesalahanmanusia • Penyimpanganprosedur Contohkejadian abnormal : kegagalanventilasikarenakegagalansistem chiller atau blower dankondisi filter yang jenuh JenisKecelakaandi INNR : • Kekritisan • Bebanmekanis • Kebakaran • Ledakan
HasilAnalisisBahaya IRM Kekritisandicegahdenganmengaturjarakpadarakpenyimpanan Kecelakaanterparah: Jatuhnya BB nuklir
SSK KESELAMATAN • Hotcell, perisaipadahotcell • Rakpenyimpanbahanbakardanwadahpengungkung ZRA lainnya • Sistemventilasi
PENUTUP • Sistem-sistemdi IRM: • Sistemoperasidanproses • Sistem Bantu • SistemKeselamatan • KegiatanUtama IRM: pengujianpascairadiasidalamhotcelldanpengembangandibidangteknologibahanbakarlainnya • Aspekkeselamatan IRM: • SSK Keselamatan • Analisisbahaya • Analisiskecelakaan