1 / 8

Redesign of a Safety Syringe

Join Jessica Chechak, Jason Keiser, and Ty Weatherby as they present their redesign of a safety syringe, incorporating three essential safety features. Learn about their progress, role, and future plans for functionality testing, prototype revisions, and document revisions.

Download Presentation

Redesign of a Safety Syringe

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Redesign of a Safety Syringe Jessica Chechak Jason Keiser Ty Weatherby

  2. Thus Far… • Creation of Design History File (last Semester) • Rough Draft of SBIR Phase I Application (last Semester) • Completed Design (mid February) • Completed Design Review (mid February) • Ordered Prototype (end of Feb) • Received Prototype (first week of Mar)

  3. Current Design

  4. Current Design

  5. Marketed Products • Our design is a compilation of 2 current designs and our ideas • Most marketed products only have 1 safety feature – we have 3 • Demonstration…

  6. My Role… • Scheduling Team Meetings • Writing Sections A and C of the SBIR Phase I Application • Editing SBIR Phase I Application • Updating Controlled Documents • Testing of Prototype • Creation of Final Powerpoint Presentation

  7. What’s Next… • Begin Functionality Testing (ASAP) • Order 3 more prototypes if initial test passed • Redesign if initial test is not passed • Continuation of Testing with New Prototypes (March) • Complete Revision of Controlled Documents (pre-testing and post-testing) • Revise SBIR Phase I Application (by April) • Create Powerpoint Presentation (by April)

  8. Any Questions?

More Related