80 likes | 87 Views
Join Jessica Chechak, Jason Keiser, and Ty Weatherby as they present their redesign of a safety syringe, incorporating three essential safety features. Learn about their progress, role, and future plans for functionality testing, prototype revisions, and document revisions.
E N D
Redesign of a Safety Syringe Jessica Chechak Jason Keiser Ty Weatherby
Thus Far… • Creation of Design History File (last Semester) • Rough Draft of SBIR Phase I Application (last Semester) • Completed Design (mid February) • Completed Design Review (mid February) • Ordered Prototype (end of Feb) • Received Prototype (first week of Mar)
Marketed Products • Our design is a compilation of 2 current designs and our ideas • Most marketed products only have 1 safety feature – we have 3 • Demonstration…
My Role… • Scheduling Team Meetings • Writing Sections A and C of the SBIR Phase I Application • Editing SBIR Phase I Application • Updating Controlled Documents • Testing of Prototype • Creation of Final Powerpoint Presentation
What’s Next… • Begin Functionality Testing (ASAP) • Order 3 more prototypes if initial test passed • Redesign if initial test is not passed • Continuation of Testing with New Prototypes (March) • Complete Revision of Controlled Documents (pre-testing and post-testing) • Revise SBIR Phase I Application (by April) • Create Powerpoint Presentation (by April)