Very Large Power System Operators in the World

Very Large Power System Operators in the World. Power System Training Institute Bangalore 4 th July 2011. 1. Indian Power System : Amongst the Largest in the World. National Grid (UK) 68GW Capita: 65m. SO - UPS (Russia) 146 GW Capita: 144 m. PJM (USA) 165GW Capita: 51m.

Download Presentation

Very Large Power System Operators in the World

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Very Large Power System Operators in the World Power System Training Institute Bangalore 4th July 2011 NLDC 1

  2. Indian Power System : Amongst the Largest in the World National Grid (UK) 68GW Capita: 65m SO - UPS (Russia) 146 GW Capita: 144m PJM (USA) 165GW Capita: 51m MidWest ISO (USA) 159GW Capita: 40m SGCC (China) 900GW Capita: 1000m RTE (France) 93GW Capita: 65m Tepco (Japan) 64GW Capita: 45m Red Electrica (Spain) 93GW Capita: 47m KPX (South Korea) 70GW Capita: 49m ONS (Brazil) 100GW Capita: 170m PGCIL (India) 163GW Capita: 1200m Terna (Italy) 57GW Capita: 60m Eskom (South Africa) 43.5GW Capita: 49m Source: VLPGO, 2010

  3. Snapshot Of Indian Power System

  4. Demand :~ 110 GW Generating Units :~ 1600 400kV & above Trans. Line :~ 700 Transformers :~ 2000 Busses :~ 5000 Control Areas :~ 100 Inter-State Metering Points :~ 3000 Schedule Matrix Elements :~ 96 X 100 X (~10) ~=100000 Open Access transactions typical daily :~ 100 Captives participating in market :~ 125 Typical Numbers for Indian Power System…

  5. Peculiarities of Indian Power System • High Growth Rate • Shortage – both (MW & MU) • Federal Structure • Decentralized Scheduling & Despatch • Diversity • Unique Holding pattern • Floating Frequency • Large Hydro Variation • Large Demand Variation

  6. How do we relate Internationally to the Other Grid Operators Worldwide ? Associations Worldwide Very Large Power Grid Operators (VLPGO) TSO-Comparison Group CIGRE - C2 and C5 committees International Interconnections SAARC

  7. Very Large Power Grid Operators(VLPGO)

  8. VLPGO Data NLDC

  9. US Utilities NLDC 9

  10. USA NLDC 10

  11. NLDC 11

  12. ENTSO-E: A trans-European network Fully operational since July 2009 • Represents 42 TSOs from 34 countries • 525 million citizens served • 880 GW generation Capacity • 270,000 km of EHV transmission lines (220 kV upwards) • 3,300 TWh/year demand • 400 TWh/year exchanges • Replaced former TSO organisations: ATSOI, BALTSO, ETSO, NORDEL, UCTE, UKTSOA NLDC 12

  13. EU Countries NLDC

  14. Formation of the VLPGO • A voluntary initiative of the world’s largest Power Grid Operators • Representing together more than 60% of the electricity demand in the world. • Created in 2004 • Not-for-profit organization • Followed several blackouts across the world • To investigate fundamental issues of common interest to its members • To develop joint action plans addressing the improvement of power system security. • Formalized in 2009 • Specific Focus • Issues related to Very Large Power Grids • Membership • Size > 50 GW

  15. VLPGO : Role of Grid Operators Worldwide • Work constantly to plan, monitor, supervise and control the energy delivered as a continuous process 24 hours a day • Delivering the electricity that powers modern societies • Critical role of Grid Operators includes • acting on behalf of Consumers, to ensure quality while minimizing costs and recognizing economic and societal dependence on electricity; • a technical role in planning, designing, and managing the Power Systems; • an interface role with generators, market participants and distributors, which are the most direct users of the transmission grid; • a natural role of interlocutors with power exchanges, regulators and governments.

  16. Common Challenges for VLPGO • Providing power system reliability and security • Smart Grid development • Integration of Renewables • Integration of Electric Vehicles • Capacity development and optimization including system renovation and development, equipment upgrading. • Reducing CO2 emissions • Improve productivity and energy efficiency • Power system visualization • Demand Side Management • Interconnections • Development of new technologies and HVDC • Establishment and coordination of new control centers 16

  17. VLPGO Vision and Mission Vision “To be a leader and a catalyst in the transition of the electric power industry to the power grid of the 21st century” Mission Develop an international consensus on strategic issues which are unique to the very large power grid and market operators Develop a common vision with respect to the technologies and best practices required to address those issues Facilitate the implementation of the vision through information exchanges, collaborative projects and cooperation with other international organizations.

  18. Objectives: Transition to Grid of 21st Century Innovate Thinking An international consensus on strategic issues challenging the very large power grid and market operators Technology Advancement A common vision with respect to the technologies and best practices required to address those issues in a framework of social and environmental responsibility of each member. Industry Leadership Through a common Communication Policy, the dissemination and implementation of a common vision through information exchange, collaborative projects and cooperation with other international organizations.

  19. Expectation within VLPGO framework • Sharing worldwide experience and knowledge on best practices to improve the power system security and performance • Building a common vision on the transition towards a more modern power system (i.e. Smart Grids) • Being catalyst towards Manufacturers and Vendors to make available the best technologies to the Power Systems • Creating a industry voice on the transition to a more sustainable energy system and the journey to COP 17 and the enabling environments required to support the electricity supply industry worldwide. • Enhancement of transmission security: security must be a permanent concern of VLPGO • Communication Strategy: PGOs must have communication strategies for regular, risk and crisis situations. 19

  20. COPS 17 The 2011 United Nations Climate Change Conference will be held in Durban, South Africa, from 28 November to 9 December 2011.[1] The conference is officially referred to as the 17th session of the Conference of the Parties (COP 17) to the United Nations Framework Convention on Climate Change (UNFCCC) and the 7th session of the Conference of the Parties serving as the meeting of the Parties (CMP 7) to the Kyoto Protocol.

  21. VLPGO Delivering Value to its Members • Emerging Technology • Identify early trends • Assess common impacts • Develop common solution requirements • Shared Learning • Identify common key operational risks • Share after-the-fact analysis of major events • Common Approaches & Solutions • Develop common specifications across suppliers • Create new market mechanisms • Produce guidelines for common reliability issues • Best Practices • Share “best” Ideas and policies • Create methodologies for evaluation or analysis • Industry Influence • Develop common positions for industry stakeholders

  22. Structure of VLPGO Activities The VLPGO consists of: Governing Board 2 Workshops 5 Working Groups 5 Joint Projects Short-term collaboration on specific project by subset of members One of exploration of topic area Task Task Task Task Task The Governing Board has: • Streamlined the working approach between different forums • Is writing guidance for conveyors – to improve performance (2010) • Focused on a smaller number of activities to deliver material progress & create a multi-year plan 22

  23. 23

  24. VLPGO 2011 Joint Activities Working Groups WG #1 – Wide Area Monitoring Applications (PJM) WG #2 – Enhanced Security (Terna/ONS) WG 2a – Security vs. Operation Costs (Terna/ONS) WG 2b – Enhanced Network Restoration (Terna/ONS) WG 2c – Equipment Overstressing (ONS) WG 2d –Security of Supply to large metro areas (?) WG #3 – Integration of Renewables (NG) WG #4 – Load Forecasting (REE) WG #5 – HVDC (ONS) WG #6 – Electric Vehicles (PJM) WG #7 – Storage (MISO) Joint Projects Visualization (SGCC) Workshops WS #1 – KPIs (SO UPS) WS #2 – Smart Grid (KPX) 24

  25. VLPGO Accomplishments thus far SynchroPhasors: WAMS Architecture Requirements and PMU Certification Test Methodology Preliminary Report”, 2008 Capacity Markets: “Market Mechanisms and incentive Instrument to Promote Generating Capacity and Demand Response”, 2008 Self Healing Grid: “Cascading Events and How to Prevent Them – Restoration Process Prevention Of Large-Scale Blackouts In The Large Metropolitan Cities”, 2006 - Application Guide “Self Healing Techniques to Prevent Black Outs and Cascading Events”, 2008 EMS Architecture: EMS Architectures for the 21st Century (transferred this work to CIGRE working group D2.24) 25 25

  26. TSO – Comparison GroupThe Group of International Comparison of Transmission System Operation Practice

  27. Mission To exchange information on Power System Operators current and future operating practices for the purpose of benchmarking. An annual survey is undertaken to ascertain Equivalent staffing requirements Best practices Performance measures Areas Transmission system operations including generation scheduling and dispatching, Electricity market operation, Operations planning, Settlements, Information technology, training, etc. Managed by Kema

  28. Most important reasons for being a member • Performance Measures Database (> 50 data points) • Comparing with other TSOs (Benchmark Model) • Identification of peers (Company profiles / Activity Lists) • Learning from other TSOs (Best Practice) • Informal contacts and TSO Questionnaires (Networking) • Counter Benchmark to Regulatory Benchmark (Insurance policy)

  29. Members Members Name Country ESKOM South Africa Red Eléctrica de España* Spain Landsnet Iceland Fingrid* Finland Amprion* Germany Transpower NZ* New Zealand Saudi Electricity Company Saudi Arabia TenneT Netherlands Statnett SF Norway PJM Interconnection** PA, USA National Grid Electricity Transmission* United Kingdom CLP Power* Hong Kong ESB NG Ireland Transpower Germany Swissgrid Switzerland Rede Eléctrica Nacional Portugal Hydro Québec Canada Svenska Kraftnät Sweden PSE Poland EWA Bahrain China Southern Power Grid China Power Grid Corporation of India Ltd. India

  30. Benchmarking Model The TSO Comparison Group is using an advanced multidimensional Benchmark Model for comparing TSOs’ System Operation organization. The Model’s “multidimensional approach” provides insight into the efficiency and effectiveness of each TSO with respect to both its own environment (size, structure, regulation et al) and to other TSO environments. The Model’s output has demonstrated the capability of identifying generic differences (resulting in ad hoc peer-groups) as well as generic similarities. The Model’s output has been utilized for mergers (in defining staff sizing requirements), and tested for self-analysis (in validating actual staff sizes).

  31. Features of the benchmarking model The model aids in highlighting the effects of non-traditional changes within peer groups. As non-traditional changes, such as new Market initiatives are developed, the Model will display the areas of change. Although the value of those changes will vary with corporate objectives, the magnitude and the areas impacted by the changes will be highlighted by the Model. The key feature of the Model is that it does not focus on defining the “best” and the “worst” TSOs, but rather focuses on identifying differences between TSOs. Whether differences are good or not will depend on many factors – the Model allows the user to make those value decisions based on the goals of the respective user.

  32. For Benchmark purposes a ‘standard TSO’ with five key System Operation processes has been defined.. System Operation

  33. ..and a process which takes into account the remaining differences between TSOs

  34. Data Collected annually since 2000,validated by KEMA, verified by group Example of data points: All data are availableformembers

  35. And summarized in management presentations Sum of fivebenchmarkresults Quality of System Operation(frequency, energynotsupplied, Voltage)

  36. Results of Annual Survey An important basis for performance comparison and for improvement of operating practices. Experience of Members of the Group discussed each year in one or two Workshops upon invitation of one of the participating companies Membership of TSO is presently restricted to up to 30 companies / departments that qualify as an operator of a bulk transmission system

  37. Issues to be Considered in International Interconnections

  38. Guiding Attributes • Spirit of regional cooperation • Approach towards long-term planning • Energy policy structure and goals • Adherence to international agreements • Encourage cross border trades

  39. International Interconnections - Benefits • Improving Reliability and Pooling of Reserves • Reduced investment in generating capacity • Improving load factor and increasing load diversity • Economies of scale • Diversity of generation mix and supply security • Economic exchange • Environmentally benign dispatch and siting of new plant • Coordination of maintenance schedules

  40. International Interconnections – Various Aspects • Technical • Commercial • Regulatory/Legal • Coordination

  41. Weblink: http://www.un.org/esa/sustdev/publications/energy/interconnections.pdf 41

  42. International Interconnections Nepal Bhutan Over 16 links of 132/33/11 KV Radial links with Nepal Net import by Nepal Tala: 1020 MW Chukha: 336 MW Kurichu: 60 MW Net import by India India- Bhutan synchronous links 400 kV Tala-Binaguri D/C 400 kV Tala-Malbase-Binaguri 220 kV Chukha-Birpara D/C 220 kV Chukha-Malbase-Birpara 132 kV Kurichu-Bongaigaon • Bangladesh • 400 KV AC line between Baharampur(India) and Bheramara(Bangladesh) with 500 MW HVDC sub-station at Bheramara Sri – LankaMadurai(India) and  Anuradhapura(Sri-Lanka) through ±500 KV HVDC under sea cable Maps not to scale

  43. Survey Questionnaires • Questionnaire I – Present Power Supply Position • Questionnaire II • Organization of the Electricity Supply Industry • Power System Planning & Planning Criterion • Legal / Regulatory Issues • Load despatch function • Technical Issues • Balancing Supply – Demand • Electricity Market • Ancillary Services • Renewable EnergyResources • Transmission Pricing • Congestion Management • Grid discipline • Investments • Existing International Interconnections • Questionnaire III – Long term projections 43

  44. Draft Template – Contents 44

  45. Draft Template – Tables and Figures 45

  46. CIGRE(INTERNATIONAL COUNCILON LARGE ELECTRIC SYSTEMS)

  47. Aim • CIGRE (International Council on Large Electric Systems) is one of the leading worldwide Organizations on Electric Power Systems, covering their technical, economic, environmental, organisational and regulatory aspects. • A permanent, non-governmental and non-profit International Association, based in France, CIGRE was founded in 1921 and aims to: • Facilitate the exchange of information between engineering personnel and specialists in all countries and develop knowledge in power systems. • Add value to the knowledge and information exchanged by synthesizing state-of-the-art world practices. • Make managers, decision-makers and regulators aware of the synthesis of CIGRE's work, in the area of electric power.

  48. CIGRE: Developing Technical Knowledge CIGRE develops technical knowledge through 3 types of activities:- Organizing Conferences and meetings, where papers are discussed,- Carrying out Permanent studies by 16 Study Committees, each dealing with a specific technical field,  publishing reports and organizing Tutorials. - Making its publications available to members of CIGRE and others. 

  49. Study Committee C2 - System Operation and Control The Study Committee C2 serves within Cigré by forming a working concept for the functionalities, structures and competence needed to operate integrated power systems in a way that is in compliance with the social requirements for security of electricity supply. The performance of power systems in real time depend on technical quality factors built into the systems through various activities and knowledge currently covered by the other Cigré Study Committees. SC C2 therefore needs to use and combine results provided within these committees. An area which is unique for C2 is however the dependency on a good performance of human resources in real-time system operation activities. In these respects SC C2 encircles a wide range of competence areas and interfaces to other disciplines.

  50. Mission and Scope of CIGRE Study Committee C2 Mission of SC C2: To facilitate and promote the progress of engineering and the international exchange of information and knowledge in the field of system operation and control. To add value to this information and knowledge by means of synthesizing state-of-the-art practices and developing recommendations. The Scope of SC C2: The scope of the SC covers the technical, human resource and institutional aspects and conditions for a secure and economic operation of existing power systems under security requirements against system disintegration, equipment damages and human injuries