1 / 28

Agency and University Partner in Campus EMS Development

Agency and University Partner in Campus EMS Development. Origination-Hazardous Waste Enforcement Case. Hazardous waste compliance assistance inspections targeted at universities in 1997 Non-compliance items found and corrective actions recommended, with re-inspection noted

josh
Download Presentation

Agency and University Partner in Campus EMS Development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agency and University Partner in Campus EMS Development

  2. Origination-Hazardous Waste Enforcement Case • Hazardous waste compliance assistance inspections targeted at universities in 1997 • Non-compliance items found and corrective actions recommended, with re-inspection noted • Second hazardous waste inspection conducted in 2000 revealed similar potential Small Quantity Generator violations

  3. Potential Violations Repeated • Waste determinations needed on potentially hazardous wastes both from facility and contractor operations • Waste accumulation containers were not dated, labeled or closed • Satellite containers were not marked or labeled with content identification or kept closed

  4. Other Repeating Violations • Certain department personnel lacked current training • Potential incidental releases of wastes were observed due either to maintenance or operational problems, or to failing or open containers • Unplanned waste generation could bump university to a LQG without intervention

  5. Waste Accumulation-Examples • Uncontrolled/unidentified paint materials left unannounced by outside contractor • Lead/acid batteries for reclamation on pallets but exposed to elements • Facility paint waste accumulating without a hazardous waste determination

  6. Multiple and Varied Waste Sources-Colleges

  7. Multiple and Varied Waste Sources-Specialized

  8. Multiple and Varied Waste Sources-Services

  9. Independent and/or Temporary Generators • Professors • Students • Supervisors • Managers • Operators • Contractors

  10. Diverse and/or Intermittent Operations • Teaching • Research • Productions • Performances • Services • Construction • Maintenance

  11. Teaching laboratories Research laboratories Contractor sites Vehicle maintenance shop Maintenance activities Painting operations Grounds-keeping Student Health Center Printing operations Janitorial operations Examples of Waste Sources

  12. Laboratory chemicals Construction/demoli-tion materials Maintenance wastes Printing chemicals Paint wastes Solvent wastes Biomedical waste Radioactive waste Examples of Waste Types

  13. Existing Waste Management System • UCF EH&S staff becoming increasingly proficient at tracking, monitoring and managing wastes • Personnel and operations generating wastes change with student population, research projects, new activities, service contracts, construction and expansion

  14. Waste Management System-Continued • EH&S staff not always able to detect and manage problematic situations • Campus is a community with many diverse entities, functions and needs • Management structure is matrix type with with different lines of authority to the top level

  15. Waste Management System-Continued • EH&S staff not fully empowered to direct and manage emerging waste issues • Potential waste generators not always predictable, informed and accountable

  16. Role of the EMS in Enforcement Negotiation • FDEP offers EMSs in settlement agreements as a means of offsetting civil penalties, fostering sustained compliance and promoting pollution prevention • FDEP began encouraging use of EMSs over recent years without really understanding their nature and benefits

  17. EMS Regulatory Tool Role-Continued • FDEP role in evaluating an EMS not defined • EMS has unclear role in regulatory arena • Personnel not all familiar with EMSs • No current unilateral basis for recognizing and using EMS in our dealings with regulated entities

  18. FDEP and UCF EMS • Negotiated as a Supplemental Environmental Project (SEP) to offset a portion of monies collected in a consent order • UCF agreed to implement a campus-wide EMS with a relatively small amount of money allotted • FDEP hoping to gain enhanced compliance

  19. UCF EMS Goal • UCF expected to implement a comprehensive EMS to consist of a systematic, periodic, and objective program to detect and correct violations by:

  20. Informing employees and agents through standards, policies and procedures; Assigning specific responsibilities for ensuring compliance throughout organization; Instituting a means for employees and agents to report violations without fear of retaliation. UCF EMS Obligations

  21. UCF EMS Function • UCF’s EMS anticipated to include provisions for:

  22. Procedure for periodic review, evaluation and monitoring of the system; Incentives to encourage all affected employees to perform in accordance with environmental requirements; Appropriate disciplinary mechanisms for failure to perform. UCF EMS Components

  23. UCF EMS Responsibility and Accountability • UCF to designate individuals responsible for implementing the EMS who are empowered to adequately address all functional areas impacting environmental issues • Approved EMS Plan to be distributed to all Department Chairs and Directors

  24. UCF EMS Reporting • UCF to submit Final Report detailing EMS implementation and including the following:

  25. UCF EMS Reporting Requirements • Description of the methods used to quantify wastes; • Expense report, receipts and other cost itemization information documenting development and implementation expenditures.

  26. FDEP’s Role • FDEP to review initial plan submitted and monthly progress reports • FDEP Pollution Prevention liaison serves as a non-regulatory/compliance assistance EMS Committee team member • Liaison negotiates EMS terms and issues between hazardous waste regulatory and university peers

  27. FDEP P2 Staff as Liaison • FDEP P2 staff member participates in EMS exercise to learn how the system works • Enables FDEP to interact as an equal on the team and provide insight and input in a non-regulatory manner • Provides FDEP staff experience with which to educate the agency and the public

  28. Sustainable Campus for Future Students • Our mutual mission • To showcase our local state campus as a leader in environmental sustainability • For our future students like this budding young scholar

More Related