1 / 7

ICC (EGSE, IA/QLA, HCSS)

ICC (EGSE, IA/QLA, HCSS). Otto H. Bauer MPE Garching. Milestones. Funding until end of 2005: approved by DLR ICC training: 11/12 October @ MPE 28 participants, tutorial and demo sessions about all aspects and work packages of the Herschel mission relevant for the PACS ICC

jovan
Download Presentation

ICC (EGSE, IA/QLA, HCSS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching PACS ICC

  2. Milestones • Funding until end of 2005: approved by DLR • ICC training: 11/12 October @ MPE • 28 participants, tutorial and demo sessions about all aspects and work packages of the Herschel mission relevant for the PACS ICC • AVM-ILT test: starts beginning of April 2002 • AVM/CQM test: starts April 2003 PACS ICC

  3. PACS ICC

  4. Current Tasks and Schedule • IA/QLA • Quick Look Analysis, Calibration Analysis, Trend Analysis, Automatic Test Analysis, Science Analysis • Version 1.0.: end of March 2002 (mainly QLA plus IA environment) • “Tiger Team” to investigate common IA structure: Report: April 4, 02 • EGSE / HCSS development • SCOS2000, MIB editor, test equipment, data model, TM/TC interface … • EGSE integration at MPE: October 22/23 • First EGSE-DPU tests at IFSI: January 14/15 (remote access from MPE possible !) • HCSS version 0.1: Integration ongoing, Beta-release available in April PACS ICC

  5. Current Tasks and Schedule (II) • Instrument Commanding • On-board command procedures (OBCP), Common Uplink System (CUS), TC/HK parameter definition, test procedures… • Ready for AVM: end March 2002 • Ready for CQM: end 2002 • CUS to be filled in March 2002 • Calibration • Def. of in-orbit cal. req., Input to ground-based cal. req. (test optics, cal. sources, astronomical sources) … • 2nd draft of calibration document (IOCRD): Feb 15 PACS ICC

  6. Current Tasks and Schedule (III) • Simulations/Modeling • Simulator as required by SIRD (to be used for end-to-end tests of operating procedures, AOT validation, SW tests etc.) under investigation • Instrument simulator (to gain a deeper understanding of the instrument by simulating the complex effects and interactions of the many steps through telescope and instrument, e.g. noise, glitches, drifts, detector time responses etc.) • 1st version of (elements of) instrument simulator: mid 2002 (linked to AOT design) • Management • SIP ready March 18 PACS ICC

  7. Current Tasks and Schedule (IV) • System Engineering • Quality assurance, config. control, ICC web pages, documentation and AI system … • AVM-ILT operation (together with H/W Team) • starting April 2002 PACS ICC

More Related