An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Greatham Lawrence Pumps PERT June 2012

  2. 12 installed across 2 identical plants Typical downtime 24 hr TiCl4 Preps for mt’ce Packed gland

  3. Led by Reliability Engineer • Involved wide cross section • Influential operators • Hands on mechanic fitters • Was able to put his ‘prejudice/paradigm’ aside • Was prepared and happy to deal with operator bugs to get more in return • Issues identified • Packing – length, tools • Shaft finish – machine company capability, hard surface • Build quality • Operating practice – N2 • OEM’s objectives

  4. Variability in build standard Ambiguity in spares Use of knowledgeable convert Embedded in SAP

  5. Bedding in Storage Vibration analysis

  6. ICON 2 Shutdown for production reasons yesterday Use of operator ‘network’ One of a suite of dashboards Configured with operator in mind Ritual review Ritual review 1-2-1 coaching