An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EFDA Task HCD-08-03-01 • Mission: Providing a document for making decision • Conceptual Design and Procurement Allocation • Urgent R&D needs Task coordinator: T. Hoang IO contact person: A. Tanga • Organization: 6 working groups (+ RO), in interaction with the IO and non EU partners. Monthly remote meeting (participation of IO and non EU). Four 3 day working meetings in 2009 • ModelingA Cardinali, F Imbeaux • LauncherM Goniche,F Mirizzi • Transmission LinesM Goniche, F Mirizzi • Diagnostics/Control System: A Ekedahl, O Tudisco • HV Power SupplyP Cara • KlystronR Magne

  2. WBS

  3. Introduction  (M.Goniche for G.T.Hoang, 5min) Presentation of the 2009  Workplan Modeling (F.Imbeaux, 10 min) Launcher (M.Goniche, 10 min) Transmission Line Lines (F.Mirizzi, 10 min) Diagnostics &Control (A.Ekedahl, 10 min) Discussion and share of the work between the European partners  (all, 20mn) Document management : WBS (J.M.Bernard, 5mn) Website (J.Hillairet, 5mn) Actions for the next meeting in Frascati (22-24 March to be confirmed) Agenda Agenda