Task HCD-08-03-01: LH4IT Follow-up meeting 12 May 09. Actions defoined at the last meeting 31 March 09
E N D
Task HCD-08-03-01: LH4IT Follow-up meeting 12 May 09 • Actions defoined at the last meeting 31 March 09 • WG1: The study will be extended to scenario 2, a hybrid scenario and current ramp-up cases. The 3.7 GHz case will be studied as well. The final choice resulting from this multi-scenario optimisation should be delivered by the end of April. • WG2: • Calculation for a PAM (1 row of 24 actives waveguides) with ALHOA, GRILL3D and TOPLHA • WP3: • To evaluate the transmission losses in circular waveguides, mode TE01, carrying a RF power of 500kW. • To analyze suitable mode filters in the MTL. • To analyze befitting bends for the MTL. • To continue the analysis of vacuum windows in order to define the most suitable ceramic materials taking into account the thermo-mechanical stresses.
Recall the actions: Hoang (5min) Report on the choice of N//: (15min +15min discussion) Report on the Launcher design: (40min + 20 min discussion) Report on the T-line design: (40min + 20 min discussion) Report on the diagnostics: (15min +15min discussion) AGENDA Agenda
Deliverables by the end of July • WG1: A. Cardinali, F. Imbeaux • Choice of N// range • Report end of July • WG2: Marc Goniche & Francesco Mirizzi • Cross-check ALOHA, GRILL3D and TOPLHA • Report end of July • RF modelling of a simple row of waveguides. • Retreive and complete DDD-2001 PAM. • Report end of July • Optimization PAM DDD2001 • Report end of July • FAM with 6 modules of 8 Active waveguides • Report end july • Cooling design and preliminary thermo-mechanical analysis of a module • Report end of July • WG3: F.Mirizzi & M. Goniche
Updated website: http://www.tpg.efda.org/hcd/public/HCD-08-03-01/ Please send us all the simulations data Task Force EFDA Website